Search Results

Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of Advanced Test Reactor Burnout Heat Transfer Tests
Croft, M. W.
January 1964
Primary view of Advanced Test Reactor Servo Regulator Rod Test Program
Pickett, R. T., III
February 1964
Primary view of Advanced Test Reactor Turbo Report
Turner, Robert A.
January 1964
Primary view of Analytical Chemistry Division Annual Progress Report, September 30, 1968
Oak Ridge National Laboratory. Analytical Chemistry Division.
1964-12~
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: March 1964
Oak Ridge National Laboratory
July 1964
Primary view of Chemical Coolants for Machining Uranium in the Presence of Trace Amounts of Chloride
Sprague, T. P.; Googin, J. M. & Phillips, L. R.
October 14, 1964
Primary view of Construction Completion Report: CAI-816, 100-N Reactor Plant
Buckner, C. L.
October 15, 1964
Primary view of An Engineering Test Program to Investigate a Loss of Coolant Accident
Wilson, T. R.; Hauge, O. M.; Matheney, G. B. & Homer, G. B.
October 1964
Primary view of Fundamentals in the Operation of Nuclear Test Reactors: Volume 3 Engineering Test Design and Operation
unknown creator
July 1964
Primary view of Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, March 1964
Heath, R. L. & Cline, J. E.
March 27, 1964
Primary view of Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, November 1964
Heath, R. L. & Cline, J. E.
November 1964
Primary view of Geophysical Seismic Evaluation Study at Hanford
Brown, Ruth E. & Raymond, John R.
December 1964
Primary view of Liquid Metal Fast Breeder Reactor Design Study: Volume 1
General Electric Company
January 1964
Primary view of Liquid Metal Fast Breeder Reactor Design Study: Volume 2
General Electric Company
January 1964
Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis Supplements
Swanberg, F.
October 1964
Primary view of PRTR second generation shim assembly
Rasmussen, D. E.
November 1964
Primary view of Results of ATR Sample Fuel Plate Irradiation Experiment
Phillips Petroleum Company
March 23, 1964
Primary view of Scintillation Spectrometry Gamma-Ray Catalogue: Volume 2
Heath, R. L.
August 1964
Primary view of Standardization and Evaluation of Grain Size Test for Uranium Fuel
Spice, R. D.
July 1964
Primary view of Welded Repair of Fill and Drain Holes in High-Carbon Steel Gas Storage Cylinders
Thompson, J. C. & Lambert, F. J.
November 5, 1964
Primary view of X-Ray Fluorescence Tables: Program Description
Amsbury, W. P.; Lee, W. W.; Rowan, J. H. & Walden, G. E.
July 20, 1964
Back to Top of Screen