Search Results

Primary view of Evaluation of Experiment Off-gas System for the EGCR-LITR Capsule Experiment
Adams, R. E. & Browning, W. E.
September 2, 1960
Primary view of Removal of Radioiodine from Air-Steam Mixtures
Adams, R. E. & Browning, W. E. Jr.
November 14, 1960
Primary view of Instrumentation Flow Plan Symbols and Recommended Drawings : a Standard System for ORNL Instrumentation Applications Work
Adams, R. K.; Davis, D. G. & Hyland, R. G.
February 21, 1958
Primary view of Symbols for Instrument Flowsheets and Drawings : a Recommended System for Application to ORNL Instrument Work
Adams, R. K.; Davis, D. G.; Hyland, R. G. & Lieberman, B.
June 19, 1962
Primary view of Metallurgical Examination of HRT Leak Detector Tubing and Flanges
Adamson, G. M; Hammond, T. M.; Kegley, T. M. & White, J. K.
January 31, 1957
Primary view of Thorex Pilot Plant ; System for Concentrating Second Uranium Cycle Product
Albrecht, W. L.
January 28, 1957
Primary view of Brief Review of Heat Transfer Problems Encountered in the Production of Magnetic Fields
Alexander, L. G.
May 25, 1959
Primary view of In-Pile Slurry Loop Program
Arehart, T. A.; Compere, E. L. (Edgar L.); Ferguson, D. E.; Korsmeyer, R. B. & McBride, J. P.
March 8, 1957
Primary view of Fission Product Activities in Irradiated Natural Uranium, Enriched Uranium, and Thorium
Arnold, E. D.
March 28, 1956
Primary view of Radiation Hazards from Recycled Reactor Fuel
Arnold, E. D.
June 9, 1959
Primary view of Problems in Accountability Measurements Associated with the Interim Chemical Processing Program
Arnold, E. D. & Gresky, A. T.
May 28, 1959
Primary view of Relative Biological Hazards of Radiations Expected in Homogeneous Reactors TBR and HPR
Arnold, E. D. & Gresky, A. T.
December 2, 1955
Primary view of Thorex Thorium Nitrate Product Specifications
Arnold, E. D. & Wischow, R. P.
May 24, 1956
Primary view of Instructions for the Operation of an ORACLE Code for a Monte Carlo Solution of the Transport Problem for Gamma Rays Incident Upon a Slab
Aulender, S. & Trubey, D. K.
October 26, 1960
Primary view of Thermal-Neutron Flux at the HRE-2  Core Wall, Determined from Zircaloy-2 Induced-Activity Measurements During Runs 13, 14, 16, 17, 18, 19, 20 and 21.
Baker, J. E.
December 20, 1960
Primary view of HRP Radiation Corrosion Studies
Baker, J. E.; Bradley, N. C.; Jenks, G. H.; Olsen, A. R.; Savage, H. C. & Walter, F. J.
August 21, 1956
Primary view of Acid Formation in the Radiolysis of Phosphorus Esters
Baldwin, W. H.
April 3, 1957
Primary view of Analog Study of the Reference Design of the Gas-Cooled ORR Loop No. 1
Ball, S. J.
November 8, 1960
Primary view of Preliminary Analog Computer Study of the Small EGCR In-Pile Loops
Ball, S. J. & Beasley, E. G.
September 21, 1960
Primary view of Determination of Submicron Particle Sized by an Activation Analysis - Centrifugation Method
Bate, L. C. & Leddicotte, G. W.
January 29, 1957
Primary view of Study of Dispersant Agents for Thorium Oxide
Bate, L. C. & Leddicotte, G. W.
August 7, 1959
Primary view of Electrical and Electronic Symbols & Drawing Committee
Bates, A.E.G
November 1961
Primary view of Electrical Design Standards and Graphical Symbols
Bates, A.E.G; Bowelle, M.M.; Horton, J. L.; Moore, R. L.; Hyland, R. F. & Brashear, C.
October 1960
Primary view of Homogeneous Reactor Test Summary Report for the Advisory Committee on Reactor Safeguards
Beall, S. E. & Visner, S.
January 5, 1955
Back to Top of Screen