This system will be undergoing maintenance January 21st between 9:00AM and 12:00PM CST.

Search Results

Primary view of Steady-State Tests of a Reactor Safety Device
Springer, T. H.
December 15, 1960
Primary view of A Device for Continuous Detection of Hydrogen in Sodium
Strahl, H.
December 15, 1960
Primary view of Analog Models for HNPF Control and Protection Studies
Dunsmore, C. L.
June 15, 1964
Primary view of Evaluation of Irradiated OMRE Fuel Elements First Core Loading
Walter, J. H.; Leirich, J. F. & Calkins, G. D.
March 1, 1960
Primary view of Reactivity Absorbed by Xenon-135 in the SRE
Woodruff, R. W.
January 28, 1960
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Coolant Flow and Outlet Temperature: Computer-Monitors for the Hallam Nuclear Power Facility Plant Protective System
Schlein, H.
September 15, 1961
Primary view of OMR Degasifier Loop Experiment
Corporales, G. W. & Benson, P. R.
May 1, 1960
Primary view of OMRE Fuel Plate Surface Temperature Measurement
Sudar, S.
May 1, 1960
Primary view of P-V-T Relationships of BF₃ Gas
Smith, C. R. F.
July 30, 1960
Primary view of Plutonium: Enriched OMR Cores
Connolly, T. J.
May 1, 1960
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Steam-Cooled Power Reactor Evaluation: Graphite-Moderated, Boiling Water, Steam-Superheat Reactor
unknown creator
September 1961
Primary view of Experimental Evaluation of a Sodium-to-Sodium Heliflow Heat Exchanger at Temperatures up to 1200°F
McDonald, J. S.
February 28, 1961
Primary view of Analysis of Stresses in Bellows
Anderson, W. F.
October 15, 1964
Primary view of Engineering Evaluation of a Mixed Alloy Fuel Element Irradiated at Elevated Temperatures in the SRE
Ballif, J. L.; Hayward, B. R. & Walter, J. W.
June 1, 1960
Primary view of Valve Stem Freeze Seal for High-Temperature Sodium
McDonald, J. S.
July 30, 1960
Primary view of Operation and Analysis of a 3000 KW Liquid Metal Model Steam Generator
Webster, L. J.
February 28, 1961
Primary view of Piqua Prototype Handling System
Nadler, H.
May 1960
Primary view of An Advanced Sodium-Graphite Reactor Nuclear Power Plant
Churchill, J. R. & Renard, J.
March 15, 1960
Primary view of A Multichannel Digital Recording System
Truitt, R. W.
September 15, 1960
Primary view of Thermal Cycling Tests of Porous Uranium
Wilkinson, L. E.
March 15, 1960
Primary view of OMRE Fuel Removal and Shipping Equipment
Mallon, P. J.; Duncan, D. S. & Noyes, R. C.
April 1, 1960
Primary view of Fabrication Modification Development for OMRE Third Core Loading
Peters, E. & Binstock, M. H.
July 15, 1961
Back to Top of Screen