Search Results

Primary view of Strain Fatigue Behavior of Zircaloy 2 and 3 at Room Temperature and 550°F
Mehan, R. L.; Groleau, D. T.; Reed, J. H. & Sokol, G. J.
November 18, 1957
Primary view of Brazing of Zircaloy 3 for Temperature Instrumented Probes
Gerken, J. M.
May 1, 1957
Primary view of Evaluation of Seal Weld Joint Designs
Kittle, D. B.
January 17, 1957
Primary view of Evaluation of the Effects of Atomic Bomb Detonations in the State of Nevada on Air-Borne Contamination at Knolls Atomic Power Laboratory, Knolls Site and Environs
Cherubin, L. J.
May 7, 1951
Primary view of Progress Report No. 14, September 1-30, 1947
Knolls Atomic Power Laboratory.
November 14, 1947
Primary view of DARTAB: A Program to Combine Airborne Radionuclide Environmental Exposure Data With Dosimetric and Health Effects Data to Generate Tabulations of Predicted Health Impacts
Begovich, C. L.; Eckerman, K. F.; Schlatter, E. C.; Ohr, S. Y. & Chester, R. O.
August 1981
Primary view of Inhibitors to Transfer of Radioactive Stainless Steel Constituents in Sodium
Mausteller, J. W. & Rodgers, S. J.
August 24, 1955
Primary view of Feasibility of Establishing a National Burial Ground for Radioactive Waste in the Northeastern United States
Morgan, James M., Jr. & Renn, Charles E.
July 15, 1956
Primary view of Reservoir Evaluation Tests on RRGE 1 and RRGE 2, Raft River Geothermal Project, Idaho
Narasimhan, Thiruppudaimarudhur N. & Witherspoon, Paul Adams
May 1977
Primary view of Compatibility of Materials in Liquid Metal
Vail, Donald B.
August 18, 1951
Primary view of Book No. 6: Laboratories Manual
H.K. Ferguson Company
July 1949
Primary view of Feasibility Study of Boiling Water Reactor Nuclear Steam Supply Systems With Capacities Up to 10,000 MWt: Final Report
Lockhart, R. W.
February 1967
Primary view of Development of a Thermionic Reactor Space Power System: Summary Report for Period, November 1, 1971 -  February 29, 1972
Gulf General Atomic Incorporated
July 31, 1972
Primary view of Boiling Nuclear Superheater (BONUS) Power Station: Startup Summary Report
Combustion Engineering, inc.
February 1966
Primary view of A Comparison of the Nuclear Defense Capabilities of Nuclear and Coal-Fired Power Plants
Brookhaven National Laboratory
May 1962
Primary view of Aerial Radiological Measuring Surveys of the Dresden Nuclear Power Station, July 1970
EG & G, Inc. Las Vegas Area Operations
January 1973
Primary view of Aerial Radiological Measuring Survey of the Area Surrounding the Monticello Nuclear Generating Plant, Monticello, Minnesota, August 1970
EG & G, Inc. Las Vegas Area Operations
September 1973
Primary view of Aerial Radiological Measuring Survey of the Area Surrounding the Enrico Fermi Atomic Power Plant, Monroe, Michigan, September 1970
EG & G, Inc. Las Vegas Area Operations
September 1973
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor (LMFBR) Follow-on Study: Tasks II & III, Westinghouse Conceptual Design Report
Westinghouse Electric Corporation. Advanced Reactors Division
April 1969
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor Follow-on Study: Conceptual Design Report, Volume 5 - Methods
North American Rockwell Corporation. Atomics International Division
1969
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor Follow-on Study: Conceptual Design Report, Volume 4 - Description of Plant Design
Aronstein, R. E.; Beimler, D. W.; Belluomini, J.; Berg, G. E.; Berger, S.; Boardman, T. J. et al.
1969
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor Follow-on Study: Conceptual Design Report, Volume 3 - Plant Safety Analyses
Harper, B. E. & Hart, R. S.
1969
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor Follow-on Study: Conceptual Design Report, Volume 2 - Engineering Studies
Aronstein, R. E. & Casey, D. F.
1969
Primary view of 1000-MWe Liquid Metal Fast Breeder Reactor Follow-on Study: Conceptual Design Report, Volume 1 - Summary
North American Rockwell Corporation. Atomics International Division
1969
Back to Top of Screen