Search Results

Primary view of Interpretation and Evaluation of the Uranium Occurences Near Goodsprings, Nevada: Final Report
Barton, Paul B., Jr. & Behre, Charles H., Jr.
December 31, 1954
Primary view of A Conceptual Study of a 100 kw Gas Cooled Reactor Power Plant for a Remote Location
Frankfort, J. H. & Thompson, W. I.
May 31, 1955
Primary view of Test of Buried Structural-Plate Pipes Subjected to Blast Loading
Williamson, R. A.
December 31, 1958
Primary view of Final Report on Interpretation and Evaluation of the Uranium Occurrences Near Goodsprings, Nevada
Barton, Paul B., Jr. & Behre, Charles H., Jr.
December 31, 1954
Primary view of Progress Report No. 37 for the Period June 1, 1955 through August 31, 1955
{{{name}}}
August 31, 1955
Primary view of Magnetic Pumps for Corrosive Gases and Liquids
Rosen, F. D.
October 31, 1951
Primary view of Thermal Test Unit
Cohen, A. & Rede, G. R.
May 31, 1950
Primary view of Effect of Plasma Oscillations on the Table-Top Model
Spitzer, Lyman, Jr.
July 31, 1952
Primary view of Boundary Disturbances in High Explosive Shock Tubes
Shreffler, R. G.
March 31, 1952
Primary view of Procedures for Uranium Spectrography
McIlhenny, R. C.
July 31, 1952
Primary view of The applicability of resistivity, self-potential and radiometric logging techniques to stratigraphic and lithologic problems in the Ambrosia Lake area, New Mexico
Misz, J. B.
July 31, 1958
Primary view of Infrared Spectra and Structure of the Crystalline Sodium Acetate Complexes of U(VI), Np(VI), Pu(VI), and Am(VI). A Comparison of Metal-Oxygen Bond Distance and Bond fFrce Constant in this Series
Jones, Llewellyn H., 1919-
January 31, 1955
Primary view of Damage to Commercial and Industrial Buildings Exposed to Nuclear Effects
Johnston, Bruce Gilbert
October 31, 1958
Primary view of Some Variable Contributors to Natural Background
O'Brien, Keran
March 31, 1958
Primary view of Steady State Temperature Distributions in Hollow Slugs
Anselone, P. M.; Banks, D. O. & Dean, R. Y.
December 31, 1953
Primary view of Final Report on the Design, Construction and Operation of a Pulsed Subcritical Uranium Assembly for Eduational Uses
Rensselaer Polytechnic Institute
December 31, 1959
Primary view of Gas Cooled Nuclear Reactor Study
Thompson, A. S.
July 31, 1956
Primary view of Pathfinder Atomic Power Plant Technical Progress Report for April 1, 1958 - June 30, 1958
unknown creator
March 31, 1958
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Quarterly Progress Report on Reactor Development: 4000 program
McLain, Stuart
July 31, 1954
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Process Engineering Report on Thorium Semi-Works Plant for the Feed Materials Production Center - Fernald, Ohio, Job No. 3542
Bulkowski, H. H.; Delaplaine, J. W.; Holby, G. V.; Natale, N. R.; Reiter, W. M. & Roe, B. J.
January 31, 1952
Primary view of Recovery of Uranium From Congo Leach Liquors With Ion Exchange Resins
Kennedy, Richard H. & Howland, Frederick A.
October 31, 1951
Primary view of Application of Heavy Media Separation, Flotation and Carbonate Leaching to Congo Ores
Breymann, John B.
October 31, 1951
Back to Top of Screen