Search Results

Primary view of Zircaloy Cladding Thickness Testers
Goodwin, Leslie E.
December 1961
Primary view of Alpha Particle Radiolysis of Anion Exchange Resins
Ahrens, Rolland W.
November 1961
Primary view of Analysis of Mixtures of Alcohols by Acylation
Fellows, William Dean & Fritz, James S. (James Sherwood), 1924-
November 1961
Primary view of Criteria for Evaluating Hazards Involved in Proposed Tests On and/or Modifications To the SM-1
Scoles, J. F.
October 18, 1961
Primary view of The Equation of State of Solids at Low Temperature
Bernardes, N. (Newton), 1931- & Swenson, C. A.
October 13, 1961
Primary view of Hazards Report for SM-1 Core II With the SM-1 Core II High Burnup Elements Replaced with SM-1 Core I Spare Elements
Coombe, J. R.; Lee, D. H. & Matthews, F. T.
October 9, 1961
Primary view of Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element
Coombe, J. R.; Lee, D. H. & Mathews, F. T.
October 7, 1961
Primary view of Scintillation Spectrometer Measurements of Capture Gamma Rays From Natural Elements: First Quarterly Report
Greenwood, Reginald C. & Stone, C. A.
October 4, 1961
Primary view of Design Criteria for Irradiated Vessels Task 6.0 Summary Report
McLaughlin, D. W.
September 29, 1961
Primary view of Hazards Evaluation of the SM-1 Penetrated Gasket
Coombe, J. R.; Gebhardt, F. G. & James, B.
September 8, 1961
Primary view of Steady State and Transient Thermal and Hydraulic Analysis of SM-2 Termination Report
Segalman, I. & Bradley, P. L.
September 8, 1961
Primary view of Consolidated Edison Thorium Reactor:  Core Assembly Physics and Zero Power Tests Report
Edlund, Milton C. (Milton Carl), 1924-; Ball, R. M.; Deddens, J. C. & Flickinger, R. F.
September 1961
Primary view of Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II
Coombe, J. R.; Scoles, J. F.; Brondel, J. O. & Lee, D. H.
September 1, 1961
Primary view of Identification of Curium-242 in Irradiated Neptunium
Carothers, Glenn A.
August 1961
Primary view of SM-2 Full Scale Flow Studies Termination Report
Christenson, J. A.; Richards, W. M. S. & Davidson, S. L.
July 30, 1961
Primary view of Internal Conversion Coefficients of the 2+-0+, E2 Transitions in Even-Even Sm152[over]90 and Gd152[over]88
Lu, D. C. & Schupp, G.
July 17, 1961
Primary view of Extrusion of Uranium Tubes
Fisher, R. E.
July 1961
Primary view of Precipitation of Neptunium Peroxide
Burney, Glenn A. & Dukes, Ernest K.
July 1961
Primary view of Extended SM-2 Critical Experiments : CE-2
McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
June 30, 1961
Primary view of Investigation of Local Boiling of SM-1
Bradley, P. L.
June 20, 1961
Primary view of Development and Testing of Low Cost Fuel Elements for Power Reactor Service
Babcock & Wilcox Company
June 2, 1961
Primary view of Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program
Hoover, H. L.
June 2, 1961
Primary view of Flow Characteristics of a Circular Weir in a Centrifugal Field
Webster, Donald S.; Williamson, Clifton L. & Ward, James F.
June 1961
Primary view of Recovery of Plutonium From Metallurgical Reduction Residues
Dukes, E. Kenneth & Prout, William E., 1921-
June 1961
Back to Top of Screen