Primary view of Hydrologic and Tracer Studies in Mohawk River at Knolls Atomic Power Laboratory
Simpson, Eugene Sidney; Beetem, W. A. & Ruggles, F. H., Jr.
July 1959
Primary view of Design and Test Analysis of the Magnetic Jacking Positive Latch Control Rod Drive Mechanism
Balog, L. J.; Bishop, A. A. & Widmer, Thomas F.
July 1959
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of Supplement No. 1. Projections of Costs, 1959-1975 for Nuclear-Conventional Power Plant Cost Study. Conventional Coal Fired Power Plants : 25,000 KW to 325,000 KW for Argonne National Laboratory, Lemont, Illinois
Chittenden, W. A.
July 2, 1959
Primary view of Kinetics of the Alkylation and Acylation of Nickel Dipivaloyimethide
Johnson, Kenneth Eugene & Hammond, George Simms, 1921-2005
July 1959
Primary view of Technical Progress Report, University of Illinois, Graduate College, Digital Computer Laboratory, July 1959
Taub, A. H., 1911-1999
July 1959
Primary view of The Chattanooga Shale of Tennessee as a Source of Uranium: Final Report
Stockdale, Paris B. & Klepser, Harry J.
July 1, 1959
Primary view of Reconnaissance for Uranium in Spain (1955-1957)
Keys, W. S. & Henderson, James G.
July 9, 1959
Primary view of The Sayapullo Mine Area, Cajamarca Department, Peru
Gabelman, John W.
July 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Possibilities for Additional Uranium in Belgian Congo
Judd, Edward K.
July 1959
Primary view of A Regulated Power Supply for a High Current Magnet
Block, Richard B.
July 1959