This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of Thorium Bismuthide : Ultrasonic Control of Crystal Size
unknown creator
March 16, 1959
Primary view of The Sequential Analysis of Ten Nuclides Occurring in Long Range Fallout Debris
Welford, George A.; Collins, William R., Jr.; Sutton, Doris C. & Morse, Robert S.
March 4, 1959
Primary view of Low Background Nuclear Counting Equipment
LeVine, H. D.; Charlton, L. & Graveson, R. T. (Robert T.)
March 23, 1959
Primary view of SM-1 (APPR-1) Research and Development Program : Final Report on Short-Lived and Fission Product Activity in the SM-1 Primary Coolant, Task III
Brown, William S. & Hasse, Robert A.
March 10, 1959
Primary view of Nuclear Prototype Power Plant Installation in Merchant Ships
Ford Instrument Company
March 11, 1959
Primary view of Reconnaissance for Uranium in the Cuzco-Anta Area, Department of Cuzco, Peru
Gabelman, John W. & Jordán O., Victor
March 1959
Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of A Transistorized Pulse Height Analyzer for Gamma Spectroscopy
Graveson, R. T.
March 23, 1959
Primary view of Liquid Metal Fuel Reactor Experiment: Annual Technical Report
unknown creator
March 25, 1959
Primary view of Oak Ridge Site Report 30,000 KiloWatt Prototype Partially Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant
Kaiser Engineers
March 1959
Primary view of Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office
ACF Industries Incorporated. Nuclear Products - ERCO Division.
March 1959
Primary view of Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Lecture Notes on Reactor Shielding
Grotenhuis, Marshall
March 1959
Back to Top of Screen