Search Results

Primary view of Metallurgy Research Operation: Quarterly Progress Report, January - March 1965
Cadwell, J. J.; Bierlein, T. K.; Bement, A. L.; Dillon, R. L. & Wheeler, R. G.
April 15, 1965
Primary view of Fast Flux Test Facility Studies Progress Report: April 1965
Astley, E. R.
April 1965
Primary view of A Sequence for Predicting Waste Transport by Ground Water
Nelson, R. William
April 15, 1965
Primary view of Geophysical Seismic Evaluation Study at Hanford
Brown, Ruth E. & Raymond, John R.
December 1964
Primary view of Static Tests of Corrosion Inhibitors for Aluminum and Carbon Steel
Richman, R. B.
February 1965
Primary view of INDEX: a Computer Program for Indexing X-ray Diffraction Powder Patterns
Goebel, J. B. & Wilson, Archie Spencer
January 1965
Primary view of PRTR second generation shim assembly
Rasmussen, D. E.
November 1964
Primary view of Health Physics Division Annual Progress Report, July 31, 1961
Oak Ridge National Laboratory. Health Physics Division.
October 31, 1961
Primary view of Kinematics of Nuclear Reactions Calculated with the IBM-704 Computer
Williams, B. D.
December 20, 1960
Primary view of Chemical Technology Division Annual Progress Report, May 31, 1961
Oak Ridge National Laboratory. Chemical Technology Division.
September 21, 1961
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Primary view of Oak Ridge National Laboratory Intrumentation and Controls Division Annual Progress Report: 1960
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 3, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1965 - September 1, 1965
Hardy, Edward P., Jr. & Rivera, Joseph
October 1, 1965
Primary view of Numerical Results for EGCR Moderator-Element Stress Problems
Hulbert, Lewis E. & Redmond, Robert F.
July 3, 1961
Primary view of In-Pile Test of Prototype ML-1 Fuel Elements
Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
June 1964
Primary view of Laboratory Development of a Tributyl Phosphate Solvent Extraction Process for Processing 20% Enriched Uranium Alloy Fuel
Goode, J. H. & Flanary, J. R.
1961
Primary view of Applied Health Physics Annual Report for 1963
Morgan, K. Z.; Davis, D. M.; Hart, J. C.; Abee, H. H.; Gupton, E. D. & Warden, A. D.
August 1964
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: September 1964
Trauger, D. B. & Whitman, G. D.
February 1965
Primary view of Physics Division Annual Progress Report, January 31, 1964
Oak Ridge National Laboratory. Physics Division.
June 1964
Primary view of Corrosion of the Volatility Pilot Plant INOR-8 Hydrofluorinator and Nickel 201 Fluorinator During Forty Fuel-Pprocessing Runs with Zirconium-Uranium Alloy
Youngblood, E. L.; Milford, R. P.; Nicol, R. G. & Ruch, J. B.
March 1965
Primary view of Development of the Assembly Method for Fuel Elements for the Advanced Test Reactor
Knight, R. W. & Leitten, C. F., Jr.
1964
Primary view of A Computer Code (CDC 1604A or IBM 7090) for Calculating the Cost of Shipping Spent Reactor Fuels as a Function of Burnup, Specific Power, Cooling Time, Fuel Composition, and Other Variables
Salmon, Royes
August 1964
Primary view of Smoothed Thermocouple Tables of Extended Significance (°C), Volume 2: Section 2.1
Adams, R. K. & Davisson, E. G.
March 1965
Primary view of Smoothed Thermocouple Tables of Extended Significance (°C), Volume 2: Section 2.2
Adams, R. K. & Davisson, E. G.
March 1965
Back to Top of Screen