Search Results

Primary view of Health Physics Division Annual Progress Report, July 31, 1962
Oak Ridge National Laboratory. Health Physics Division.
1962
Primary view of Maritime Reactor Project Annual Progress Report, November 30, 1961
Oak Ridge National Laboratory
1962~
Primary view of Molten-Salt Reactor Program Semiannual Progress Report, March 1 - August 31, 1961
Oak Ridge National Laboratory
1962
Primary view of One-Pion Exchange and the Optical Model
Bjorklund, Frank E.; Lippmann, Bernard A. & Moravcsik, Michael J.
1962
Primary view of Pulse Amplifier Manual
Fairstein, E.
1962
Primary view of Reactor Chemistry Division Annual Progress Report for Period Ending January 31, 1962
Oak Ridge National Laboratory
1962
Primary view of High Power Density Development Project: Interim Report, 300 MWe HPD Conceptual Design Study
Grayhek, V. G.
January 5, 1962
Primary view of Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3
Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
January 11, 1962
Primary view of Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants
Haraway, E. S. & Saccocio, R. M.
January 23, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Alco Products (Firm)
January 31, 1962
Primary view of Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII
Pomeroy, D. L.
February 1, 1962
Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis
Anderson, J. K. & Winegardner, W. K.
February 1962
Primary view of Results of Air-Water and Steam-Water Tests on Radial Vane Steam Separator Models
Riesland, J. I.
February 1962
Primary view of Salt Bath Heat Transfer Rates for Uranium Plate
Burditt, R. B.
February 1, 1962
Primary view of Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant
U.S. Atomic Energy Commission
February 25, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Alco Products (Firm)
February 28, 1962
Primary view of BWR Reference Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.
Bradley, P. L. & Coombe, J. R.
February 28, 1962
Primary view of PWR Preliminary Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Magnetic Force Welding Sintered Aluminum Powder Materials
Mills, L. E.
March 1962
Primary view of Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 4, Gas-Cooled Loop Anaysis
Wittenbrock, N. G.
March 1962
Primary view of PL-3 Phase I Task 3 Research and Development Report
Humphries, G. E.
March 12, 1962
Primary view of Automatic Mass Spectrometer for Isotopic Analysis of Lithium
McBryde, W. T. & Gammon, E. F.
March 15, 1962
Primary view of Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section
Stephenson, L. D.
March 15, 1962
Back to Top of Screen