Search Results

Primary view of Conversion of UNH to UO3 : Terminal Report
Maness, R. F. & Clagett, F.
January 10, 1951
Primary view of Filtration of Radioactive Aerosols by Glass Fibers: Part Two -- Appendices
Blasewitz, A. G.; Carlisle, R. V.; Judson, B. F.; Katzer, M. F.; Kurtz, E. F.; Schmidt, W. C. et al.
April 16, 1951
Primary view of Operation and Maintenance Instructions for Gamma Scintillation Monitor - Model 3
Connally, R. E.
October 1, 1953
Primary view of Dual Channel Pulse Analyser and Count-Rate Meter for Gamma Spectrometer Monitor
Paul, R. S. & Wood, M. R.
June 17, 1954
Primary view of Effect of Process Variables on Graphite Purity
Riley, W. C. & Corners, A. M.
July 20, 1954
Primary view of Structural Evaluation of Underground Waste Storage Tanks
Smith, Edgar F.
June 23, 1955
Primary view of Final Design Report KAPL-120 High Pressure Recirculating Water Loop
Wade, G. E. & Berberet, J. A.
January 15, 1956
Primary view of Joint Design for Making Root Pass Welds without Filler Material
Lemon, L. C. & Smith, W. R.
July 9, 1956
Primary view of Program Study Report Plutonium Fuel Cycle
Albaugh, F. W. & Fryar, R. M.
July 30, 1956
Primary view of The Purex process : a Solvent Extraction Reprocessing Method for Irradiated Uranium
Irish, E. R. & Reas, W. H.
April 8, 1957
Primary view of A Martensitic Reaction for Uranium
Bement, A. L. & Wallace, W. P.
June 25, 1957
Primary view of Plating Thickness Tester
Fitch, C. E., Jr.
November 15, 1957
Primary view of An Addendum to a Parametric Study of the Gas-Cooled Reactor Concept
Hanford Works
March 1, 1958
Primary view of Factors Affecting Fluidization of Uranium Trioxide Powders
Johnson, B. M.
March 1, 1958
Primary view of Design and Installation of a High Precision Temperature and Intimate Contact Monitor for Experimental Vacuum Chucks
Morrow, G. W.
May 15, 1958
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Primary view of The Effect of Temperature on the Neutron Attenuation of Magnetite Concrete
Wood, D. E.
December 11, 1958
Primary view of Trans-Plutonium Isotope Buildup by Neutron Irradiation of Plutonium
Brauer, F. P. & Burley, Helen H.
December 15, 1958
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Description of Purex Plant Process
Irish, E. R.
May 19, 1959
Primary view of Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity
Jackson, P. M.
June 26, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Distribution of the Actinide Elements in the Molten System: KCI-AICI3-AI
Moore, R. H. & Lyon, W. L.
October 20, 1959
Primary view of Ultrasonic Resin Level Detector
Hunter, D. O. & Pleasance, C. L.
January 15, 1960
Back to Top of Screen