This system will be undergoing maintenance October 10th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of Accurate Nuclear Fuel Burnup Analyses; Second Quarterly Progress Report, (March - May 1962)
Rider, B. F.
July 1, 1962
Primary view of An Alpha Scintillation Tester for Uranium Surface Contamination of N-Reactor Fuel
Jackson, C. N., Jr.
July 1963
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: March 1964
Oak Ridge National Laboratory
July 1964
Primary view of Basic Chemistry of High Temperature Inorganic Systems, Semiannual Progress Report: July-December 1956
Yosim, S. J. & Milne, T. A.
July 15, 1957
Primary view of Calculations of the Madelung Constant and Inverse Twelfth Power Repulsion Factors for the Wurtzite Crystal Structure
Gehman, William G.
July 25, 1965
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Cost Study of a 100-Mw(e) Direct-Cycle Boiling Water Reactor Plant
Bullinger, C. F. & Harrer, J. M.
July 1960
Primary view of The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results
Zelezny, W. F.
July 12, 1963
Primary view of The Ductility of Brazed Stainless Steel Joints
Saller, Henry A.; Stacy, J. T. & Eddy, N. S.
July 8, 1953
Primary view of EDP Procedures in Technical Library Operations
Griffin, Hillis L.
July 30, 1963
Primary view of Effect of Plasma Oscillations on the Table-Top Model
Spitzer, Lyman, Jr.
July 31, 1952
Primary view of An Experimental Investigation of Two-Phase, Two-Component Flow in a Horizontal, Converging-Diverging Nozzle
Vogrin, Joseph A., Jr.
July 1963
Primary view of Fabrication Modification Development for OMRE Third Core Loading
Peters, E. & Binstock, M. H.
July 15, 1961
Primary view of Feasibility Study of a 1000-Mwe Sodium-Cooled Fast Reactor: Volume 1 - Technical and Economic Potential
Eggen, D. T.; Cochran, J. C. & Gibson, A. S.
July 1966
Primary view of Feed Materials Production Center Summary Technical Report: April 1, 1963-June 30, 1963
unknown creator
July 18, 1963
Primary view of FMPC Solvent Treatment Area - Process Design
Pfeiffer, Carl & Maerker, John B.
July 6, 1951
Primary view of Fuel Core Tester - UT-2
Frederick, C. L. & Waldkoetter, G. L.
July 18, 1960
Primary view of Fuel Cycle Program Progress Report: Fifteenth Report, January-June 1964
Howard, C. L.
July 15, 1964
Primary view of Fundamental and Applied Research and Development in Metallurgy: Conceptual Design of a U-233 Fuel Refabrication Plant
Nowak, W. B. & Wessling, B. W.
July 30, 1962
Primary view of Fundamentals in the Operation of Nuclear Test Reactors: Volume 3 Engineering Test Design and Operation
unknown creator
July 1964
Primary view of Further Studies on Large-Batch Melting of Uranium
Rengstorff, George W. & Lownie, Harold W., Jr.
July 11, 1955
Back to Top of Screen