Search Results

Primary view of Completion Report for Contracts AT(10-1)-1054, AT(10-1)-1122 : Drilling, Casing and Cementing Observation Wells at the National Reactor Testing Station, Idaho
Keys, W. S.
May 1, 1963
Primary view of Determination of the Effect of High Excess H2SO4 Concentrations on the Radiation-Induced Corrosion of Zirconium and Titanium Alloys in 0.17 m UO2SO4
Jenks, G. H.
May 1, 1962
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Heat Transfer Coefficients with Annular Flow During "One-Through" Boiling Water to 100 Per Cent Quality at 800, 1100, 1400 PSI
Polomik, E. E.; Levy, S. & Sawochka, S. G.
May 1, 1961
Primary view of OMR Degasifier Loop Experiment
Corporales, G. W. & Benson, P. R.
May 1, 1960
Primary view of OMRE Fuel Plate Surface Temperature Measurement
Sudar, S.
May 1, 1960
Primary view of Plutonium: Enriched OMR Cores
Connolly, T. J.
May 1, 1960
Primary view of Thermal Cycling and Leakage Tests of 12-inch Valves for Sodium Service
Baroczy, C. J.
May 1, 1960
Primary view of The High Intensity Food Irradiator: Report 17
Curtiss-Wright Corporation
May 1, 1960
Primary view of Remote Radiological Monitoring
Sigoloff, Sanford C. & Borella, H. M.
May 1, 1959
Primary view of Design and Feasibility Study of a Pebble Bed Reactor-Steam Power Plant
unknown creator
May 1, 1958
Primary view of SNAP 2: Structural and Dynamic Analysis
Castle, R. A.
May 1, 1964
Primary view of Progress Relating to Civilian Applications During April, 1956
Dayton, Russell W. & Tipton, Clyde R., Jr.
May 1, 1956
Primary view of Progress Relating to Civilian Applications During April, 1958
Dayton, Russell W. & Tipton, Clyde R., Jr.
May 1, 1958
Primary view of Oak Ridge Static Autoclave Water Decomposition Test
Humphreys, J. R., Jr.; Abers, E. L. & Brown, P. E.
May 1, 1951
Primary view of Semi-Annual Progress Report in Metallurgy for the Period October 1, 1950 - March 31, 1951
Wilhelm, Harley A.
May 1, 1951
Primary view of Semi-Annual Progress Report in Chemistry for the Period October 1,1950--March 31,1951
Ames Laboratory
May 1, 1951
Primary view of Process Monitor Analysis Victoreen Model 350
Harter, J. A. & Olson, E. L.
May 1, 1947
Primary view of Final Report on Reactor Fuel Element Research, Development, and Production
Warner, W. T.
May 1, 1950
Primary view of Shielding Requirements for the Army Package Power Reactor
Meem, J. L. (James Lawrence). & Fairbanks, F. B.
May 1, 1956
Primary view of Scale "Up or Down" Analysis for Prototype Test
Alco Products (Firm)
May 1, 1960
Primary view of Safety Evaluation of PNPF Modifications
Huntsinger, M. & Hart, R. S.
May 1, 1969
Primary view of Utilization of Radiactive Isotpoes in Coal Process Research
Yavorsky, P. M. & Gorin, E.
May 1, 1961
Primary view of Significance Arithmetic on the IBM 7090
Goldstein, Max
May 1, 1962
Back to Top of Screen