Search Results

Primary view of Analysis of Carbon Monoxide-Nitrogen Mixtures by High Resolution Mass Spectrometry
Conzemius, Robert Joseph & Svec, Harry J. (Harry John), 1918-
February 1962
Primary view of Boiling Nuclear Superheater (BONUS) Power Station : Final Hazards Summary Report
unknown creator
February 1, 1962
Primary view of Chemonuclear Processing
Steinberg, Meyer, 1924-
February 1962
Primary view of Fabrication of UO2 Fuel Elements by Vibrational Compaction
Marah, Harold G.
February 1962
Primary view of Formation of Hydrazine From the Radiolysis of Ammonia in the Presence of Mineral Solids
Kramer, Henry; Pruzansky, Jacob & Steinberg, Meyer, 1924-
February 1962
Primary view of Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII
Pomeroy, D. L.
February 1, 1962
Primary view of Measurements of Negative Muon Lifetimes in Light Isotopes
Eckhause, Morton
February 1962
Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis
Anderson, J. K. & Winegardner, W. K.
February 1962
Primary view of Preparation of Sodium Ethylsulfate
Walker, John Craig; Olson, E. H. & Burkhart, L. E.
February 1962
Primary view of Results of Air-Water and Steam-Water Tests on Radial Vane Steam Separator Models
Riesland, J. I.
February 1962
Primary view of Salt Bath Heat Transfer Rates for Uranium Plate
Burditt, R. B.
February 1, 1962
Primary view of The Significance of Urine Uranium Excretion Data
Lippmann, M.; Ong, Long D. Y. & Harris, W. B. (William B.)
February 1962
Primary view of Eddy Transport in Liquid-Metal Heat Transfer
Dwyer, Orrington Embry, 1912-
February 18, 1962
Primary view of Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant
U.S. Atomic Energy Commission
February 25, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Alco Products (Firm)
February 28, 1962
Primary view of BWR Reference Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.
Bradley, P. L. & Coombe, J. R.
February 28, 1962
Primary view of PWR Preliminary Design for PL-3
Humphries, G. E.
February 28, 1962
Back to Top of Screen