Search Results

open access

Progress letter No. 11 for January 1, 1960 through January 31, 1960

Description: A stainless steel autoclave for superheated water corrosion test was installed and "conditioned". Tests were begun to investigate the feasibility of densifying slip cast stainless steel by means of liquid phase sintering. Attempts to prepare tubular fuel elements by vacuum forming were resumed. Although thick-walled vacuum formed casting have been sintered on the aluminum mandrels without cracking, this has not yet been accomplished with the think sections of interest.
Date: February 15, 1960
Creator: Baron, Edeard H.
Partner: UNT Libraries Government Documents Department
open access

Progress Report for Period Covering January 15, 1960 - February 15, 1960

Description: Thorium Procedure: As was mentioned in the last report, ammonium nitrate was substituted for ferric nitrate as a salting agent. Also, the acidity of the nitrate solution was reduced from 3.0 molar to 0.5 molar. the revised thorium procedure is described in the report. Radium Procedure: Work has ben initiated on the procedure of Petrow, Nietzel and DeSesa (Winchester Procedure) to determine if the procedure is suitable for very low level concentrations of radium.
Date: February 15, 1960
Creator: Petrow, Henry G.
Partner: UNT Libraries Government Documents Department
open access

Critical Mass Studies of Plutonium Solutions

Description: Chain reacting conditions for plutonium nitrate in water solution have been examined experimentally for a variety of sizes of spheres and cylinders.
Date: February 15, 1960
Creator: Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen