Search Results

Primary view of A Transistorized Pulse Height Analyzer for Gamma Spectroscopy
Graveson, R. T.
March 23, 1959
Primary view of Accidental Radiation Excursion at the Y-12 Plant, June 16, 1958: Final Report
Patton, F. S.; Bailey, J. C.; Callihan, A. D.; Googin, J. M.; Jasny, G. R.; McAlduff, H. J. et al.
September 12, 1958
Primary view of Portable Mercury Vapor Detector
McMurray, C. S. & Redmond, J. W.
March 14, 1958
Primary view of Uranium Concentration Meter
Arnett, Orville
September 24, 1956
Primary view of A Continuous Water Monitor for Detecting PPM Quantities of Alkali Metals
Been, Julian F.
June 20, 1955
Primary view of Production of Zirconium at Y-12
Ramsey, J. W. & Whitson, W. K., Jr.
November 17, 1955
Primary view of Status Report and Plant Proposals for Zirconium Purification
Leaders, W. M.
November 18, 1955
Primary view of Separation of Zirconium & Hafnium : Proposal for Construction & Operation of Zirconium Production Plant
Googin, J. M. & Strasser, G. A.
November 17, 1955
Primary view of Zirconium-Hafnium Separation : Mixer-Settler Studies : Final Report
Waldrop, F. B.; Ward, W. T. & Leaders, W. M.
November 17, 1955
Primary view of Progress Report on Waste Concentration Studies: Engineering Results on the BNL Semi-Works Vapor Filtration Vapor Compression Evaporator
Horrigan, R. V.; Fried, H. M.; Manowitz, B.; Kuhl, O.; Baranosky, J. A.; Bellanca, S. et al.
August 15, 1951
Primary view of Environmental Factors at Proposed Site of Dresden Generating Station of Commonwealth Edison Company
Kiefer, W. M.; Chiarottino, M. N.; Geue, D. W.; Veras, A. F. & Bonilla, Charles F.
June 15, 1955
Primary view of Final Report to U.S. Atomic Energy Commission: Low-Temperature Heavy Water Plant
unknown creator
March 15, 1951
Primary view of Mineralogy of Uranium-Bearing Deposits in the Boulder Batholith, Montana: Final Report, July 1, 1952 to December 31, 1956
Wright, Harold D.; Bieler, Barrie H.; Emerson, D. O. & Shulhof, W. P.
October 23, 1957
Primary view of Nuclear Metals Annual Progress Report: 1956-1957
Nuclear Metals, Inc.
November 20, 1957
Primary view of Research and Development Progress Report
unknown creator
October 15, 1952
Primary view of Zirconium Metal Fines Recovery: Interim Technical Report for May 15, 1950 to December 15, 1950
Ogburn, S. C., Jr. & Reader, L. J.
January 24, 1951
Primary view of The Effect of Copper, Nickel, Iron, and Chromium on the Tensile Properties of Preferentially Oriented Beryllium Sheet
Yans, F. M.; Donaldson, A. D. & Kaufmann, A. R.
February 14, 1958
Primary view of HASL Aerial Survey System
Cassidy, M. E.; Graveson, R. T. & LeVine, H. D.
July 29, 1957
Primary view of Influence of Shield Configuration on Cargo Capacity of Nuclear Powered Ships
Klepper, O. H.
January 16, 1956
Primary view of An Inexpensive, Wide Range Gamma Ray Geiger Survey Meter
LeVine, H. D. & DiGiovanni, H. J.
January 4, 1951
Primary view of Studies on the Atomic Bomb Injuries in Hiroshima City
unknown creator
February 13, 1950
Primary view of Potential Applications of Nuclear Energy for Process and Space Heat in the United States
Geiringer, Paul Ludwig & Goodfriend, Morton J.
October 1958
Primary view of Uranium Migration in UOâ‚‚-Bearing Ceramics
Quirk, J. F.; Smalley, A. K.; Duckworth, W. H. & Ferrell, Edward Francis.
September 4, 1953
Primary view of Mechanical Properties of Zirconium and Zirconium-Uranium Alloys Containing Tin
Schwope, A. D.; Muehlenkamp, G. T. & Chubb, Walston
September 29, 1952
Back to Top of Screen