Search Results

Primary view of Anderson Physical Laboratory Progress Report
Hendricks, Lloyd
August 25, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959
Aerojet-General Corporation
May 25, 1959
Primary view of Theory of Asymmetric Arrays of Control Rods in Nuclear Reactors
Murray, Raymond L.
April 25, 1959
Primary view of Liquid Metal Fuel Reactor Experiment: Annual Technical Report
Babcock & Wilcox Company
March 25, 1959
Primary view of Reactor Automatic Control and Load Swing Test. Test Results DL-S-144 (T-554924). Section I. Second Performance
Mafrica, Roces
March 25, 1959
Primary view of Reactor Plant Container Air Cooling System. Section III. Second Performance.
Duquesne Light Company
March 25, 1959
Primary view of Thermoelectric Properties of the Plasma Diode
Lewis, H. W. & Reitz, John R.
July 25, 1958
Primary view of Review of the Corrosion Product Radioactivity Program at the Army Package Power Reactor : Alco R & D report
Medin, A. L.
April 25, 1958
Primary view of Power Reactor Program. Progress Report to E. I. du Pont de Nemours and Company for the Period February 21, 1958 through March 18, 1958
Klein, J. L.; White, A. M.; Jenkins, R. G.; Kaufman, D. F.; Nowak, W. B.; Isserow, S. et al.
March 25, 1958
Primary view of Power Reactor Program. Progress Report to E. I. du Pont de Nemours and Company for the Period September 21, 1957 through October 16, 1957
White, A. M.; Corzine, P. D.; Isserow, S. & Kaufman, D. F.
October 25, 1957
Primary view of Uranium occurrences in the Kelso Valley area, Kern County, California
Bowes, William A.; Bales, W. E. & Haselton, G. M.
October 25, 1957
Primary view of Power Reactor Program. Progress Report to E. I. du Pont de Nemours and Company for the Period August 21, 1957 through September 20, 1957
White, A. M.; Corzine, P. D.; Aronin, L. R.; Klein, J. L. & Isserow, S.
September 25, 1957
Primary view of A Martensitic Reaction for Uranium
Bement, A. L. & Wallace, W. P.
June 25, 1957
Primary view of Coincidence Techniques for Cyclotron Experiments
Northrop, J. A.; Stokes, R. H. & Boyer, Keith
April 25, 1957
Primary view of Fission Thresholds from (d,p) Stripping Reactions
Stokes, R. H.; Boter, Keith & Northrop, J. A.
April 25, 1957
Primary view of Instrumentation and Controls Division Semiannual Progress Report for Period Ending July 31, 1956
Borkowski, C. J.
February 25, 1957
Primary view of The Measurement of the Velocity of Sound in a Liquid Containing Gas Bubbles
Karplus, H. B. & Benson, R. W.
February 25, 1957
Primary view of Effect of Low Temperatures on Tin Solders and Soldered Joints, Tin Castings, and Dipped Tin Coatings
Montgomery, H. E.
January 25, 1957
Primary view of Interaction of Enriched Uranium Assemblies
Henry, H. F.
June 25, 1956
Primary view of Description and Some Safeguard Aspects of Proposed Developmental Fast Neutron Breeder Reactor
Atomic Power Development Associates
July 25, 1955
Primary view of A Study of Location Times for Positions Arranged on a Panel in a Random and an Ordered Manner
Beeler, J. R.
May 25, 1955
Primary view of A Preliminary Report on the MTR Crystal Spectrometer
Evans, J. E.
April 25, 1955
Primary view of The Quantitative Techniques of Scintillation Spectrometry as Applied to the Calibration of Standard Sources
Heath, R. L. & Schroeder, F.
April 25, 1955
Primary view of Studies on the Experimental Pathology and Biochemistry of the Pulmonary Granulomatosis of Beryllium Workers. Section II, Consolidated Progress Report. Supplement: a Review of the Physical Chemistry of Beryllium
Schepers, G. W. H. (Gerrit Willem Hendrik), 1914- & Scheel, Lester D.
April 25, 1955
Back to Top of Screen