Search Results

open access

Fast Neutron Flux Measurements and Analysis in SM-1 and PM-2A Core and Vessel Mockups

Description: Abstract: This technical report contains a summary of experimental and analytical work performed on cold clean SM-1 Core II with special components and PM-2A Core I each with thermal shield and vessel mockups. The purpose of this work was to define the neutron intensity and spectra to which the pressure vessels are subjected in order to assess the effect of irradiation on the vessel lifetimes. The radial distributions of the energy dependent neutron flux per unit power in the core and vessel m… more
Date: March 31, 1962
Creator: Sontheimer, K. C.; Kemp, S. N.; Lois, L.; Clancy, E. F. & McCool, W. J.
Partner: UNT Libraries Government Documents Department
open access

Startup Testing of the PM-2A Nuclear Power Plant

Description: Abstract: A detailed description of the PM-2A reactor, primary system and instrumentation is presented. A general description of the secondary system and plant arrangement at Camp Century, Greenland is included. The results of the startup physics, shielding, thermal and hydraulics and radiochemistry test are presented. the analysis performed on the shielding and thermal and hydraulic tests is included. The shielding problem at startup and the shielding modification made to the plant are describ… more
Date: March 31, 1962
Creator: McCool, W. J.; Ryan, R. M.; Richards, W. M. S.; Bradley, P. L.; Stephenson, L. D. & Cox, J. F.
Partner: UNT Libraries Government Documents Department
open access

PM-2A Core II Zero Power Experiment

Description: Abstract: This technical report covers the zero power experiments performed on PM-2A Core II at the Alco Critical Facility. PM-2A Core II is the first replacement core for a portable pressurized reactor at Camp Century, Greenland. Core II is the same as Core I with the exception that Core II has an increased burnable poison (B-10) content. The zero power experiment consisted of fuel element uniformity test; core assembly test, development of an on-site loading procedure and an analysis of exper… more
Date: March 30, 1962
Creator: Walthousen, L. D.; Mageean, J. V.; Raby, T. M. & Lee, D. H.
Partner: UNT Libraries Government Documents Department
open access

Summary Report of Analysis of Physics Measurements Performed on SM-1 Core I

Description: Abstract: This technical report contains a comprehensive analysis of the nuclear characteristics of the SM-1 Core I. Comparison of analytical and experimental results for neutron ages and core reactivities of a variety of cases investigated shows that the MUFT III with P-1 slowing down approximation gives the best results. At startup the core reactivity and rod bank worth under various operating conditions are investigated and compared to experiment. Core lifetime was calculated to be 16.8 MWYR… more
Date: March 30, 1962
Creator: Lois, L.; Paluszkiewicz, S.; Fried, B. E. & Beam, R. H.
Partner: UNT Libraries Government Documents Department
open access

SM-1 Reactor Vessel Closure Stud Investigation

Description: Abstract: This report presents metallurgical .analyses and corrosion tests conducted to determine :causes of failure of two SM- 1 reactor vessel studs due to fracture in the threaded areas, after 23 months' operation (March 1959). Conclusions of corrosion tests are: (1) failure of the studs was caused by stress corrosion cracking, (2) contributing factors to failure of the studs were improper control of heat treatment of the studs and absence of treatment for stress relief after thread grindin… more
Date: March 23, 1962
Creator: Reali, D. L.
Partner: UNT Libraries Government Documents Department
open access

Shielding Measurements at the SM-1 Reactor : June 1961

Description: Abstract: Neutron flux and gamma radiation measurements through the SM-1 primary shield were made at the startup of Core II in June 1961. They extend previous measurements (APAE-35) both vertically and horizontally in the primary shield and in the rod drive pit. Dose rate measurements on spent fuel elements under water are also reported.
Date: March 16, 1962
Creator: Moote, F. G. & Obrist, C. H.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Description: Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1.… more
Date: March 15, 1962
Creator: Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

PL-3 Phase I Task 3 Research and Development Report

Description: Abstract: This technical report summarizes the results of research and development tasks performed during Phase I of this contract and presents recommendations for future development work. Work is reported in the areas of plant assembly and relocation, housings and footings, waste heat dissipation, instrumentation, refueling systems, waste disposal, shielding, core nuclear thermal and hydraulic studies, gaseous waste processing (BWR), and critical experiments on a 5 x 5 array of Type 3 fuel ele… more
Date: March 12, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen