Search Results

Primary view of Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 3. Analog Simulation of Reactor Plant Transients
Combustion Engineering, inc. Nuclear Division.
October 23, 1961
Primary view of Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 5. Spiked Core Concept
Combustion Engineering, inc. Nuclear Division.
October 23, 1961
Primary view of SL-1 Annual Operating Report: February, 1960-January 3, [1961]
unknown creator
June 15, 1961
Primary view of The Cold Pressing of Sinterable UO₂
Levey, R. P., Jr.
March 27, 1961
Primary view of The Influence of Design and Production Parameters on Fabrication Costs of Nuclear Reactor Fuel Elements
Stein, P. E.; Ayers, A. C.; Braatz, R. J.; Bradford, C. M.; Holt, V. D. & Mattie, G. P.
November 1, 1961
Primary view of Nuclear Port Survey of the State of New York
Ebasco Services Incorporated
November 1961
Primary view of Progress Report Pebble Bed Reactor Program: June 1, 1959-October 31, 1960
unknown creator
July 1961
Primary view of Reactor Containment Design Study
Johnson, R. A. & Nelson, I.
May 18, 1961
Primary view of Boiling of Freon-114 in a Three-Foot Straight Tube Evaporator
Allen, Charles F.
October 19, 1961
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Coolant Flow and Outlet Temperature: Computer-Monitors for the Hallam Nuclear Power Facility Plant Protective System
Schlein, H.
September 15, 1961
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Steam-Cooled Power Reactor Evaluation: Graphite-Moderated, Boiling Water, Steam-Superheat Reactor
unknown creator
September 1961
Primary view of Experimental Evaluation of a Sodium-to-Sodium Heliflow Heat Exchanger at Temperatures up to 1200°F
McDonald, J. S.
February 28, 1961
Primary view of Operation and Analysis of a 3000 KW Liquid Metal Model Steam Generator
Webster, L. J.
February 28, 1961
Primary view of Fabrication Modification Development for OMRE Third Core Loading
Peters, E. & Binstock, M. H.
July 15, 1961
Primary view of Final Safeguards Summary Report for the Piqua Nuclear Power Facility
unknown creator
August 1, 1961
Primary view of Design Modifications to the SRE during FY 1960
Deegan, G. E.; Dermer, M. D.; Flanagan, J. S.; Gower, G. C.; Hall, R. J.; Hinze, R. B. et al.
February 15, 1961
Primary view of Metallurgical Aspects of SRE Fuel Element Damage Episode
Ballif, J. L.
October 15, 1961
Primary view of Investigations of Neutron Penetration in TiH and Steel Slabs
Karcher, R. H.
May 15, 1961
Primary view of Corrosion and Activity Transfer in the SRE Primary Sodium System
Johnson, H. E.
October 30, 1961
Primary view of The Gamma to Gamma Prime Transformation in the Uranium-Molybdenum System
Kramer, D. & Rhodes, C. G.
December 31, 1961
Primary view of Critical Path Scheduling in Maintenance
Gritzner, C. L.; Jones, J. P. & Ellis, J. M.
April 10, 1961
Primary view of Oak Ridge National Laboratory Intrumentation and Controls Division Annual Progress Report: 1960
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 3, 1961
Back to Top of Screen