Search Results

open access

Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation

Description: From summary and conclusions: The purpose of this volume is to present the results of design studies to select the optimum-sized electric power station utilizing an organic cooled nuclear reactor and to evaluate and optimize the various reactor concepts, with special attention to selection of the moderator, consistent with the basic design criteria established by the AEC.
Date: July 1959
Creator: Bechtel Corporation
Partner: UNT Libraries Government Documents Department
open access

A Regulated Power Supply for a High Current Magnet

Description: Current regulation of a Bitter type electromagnet powered by a 10 kw. motor-generator set has been achieved by control of the generator exciting field. An error signal, obtained by comparing the voltage drop across a series resistor in the magnet circuit with a reference voltage, is fed back with appropriate amplification to the grids of series tubes in the generator field supply. Magnetic fields from 400 gauss to 10 kilogauss in a fixed gap (1.5 in. width and 3.5 in. diameter) are obtainable w… more
Date: July 1959
Creator: Block, Richard B.
Partner: UNT Libraries Government Documents Department
open access

Supplement No. 1. Projections of Costs, 1959-1975 for Nuclear-Conventional Power Plant Cost Study. Conventional Coal Fired Power Plants : 25,000 KW to 325,000 KW for Argonne National Laboratory, Lemont, Illinois

Description: In order to establish a basis for comparing the estimated cost of nuclear power plant designs, a set of general and detailed design considerations for conventional coal-fired power plants was established. Five preliminary designs of conventional coal-fired power plants ranging in size from 25to 325 mw were selected, and cost estimates were prepared. Supplement 1 shows a year by year projection of costs for the period 1959-1975.
Date: July 2, 1959
Creator: Chittenden, W. A.
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design

Description: From introduction: In general, the objective of this study is to provide for the development of the conceptual design criteria for the most promising type of boiling water reactor and associated complete electrical generating plant consistent with a schedule calling for start of construction in July 1960.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 2]: Separate Studies

Description: From introduction: This section presents the principal results of the optimization study done to establish the economic basis for selection of the core and fuel design.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation

Description: From introduction: The objectives of this study are to determine the estimated capital and energy costs of this typical conventional coal-fired installation, consistent with a schedule calling for completion of construction April 1964.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

The Sayapullo Mine Area, Cajamarca Department, Peru

Description: Introduction: The writer visited the Sayapullo mine May 14 and 15, 1959, for comparative orientation, study of the uranium occurrence, and observation of alternation-metallization relations.
Date: July 1959
Creator: Gabelman, John W.
Partner: UNT Libraries Government Documents Department
open access

Kinetics of the Alkylation and Acylation of Nickel Dipivaloyimethide

Description: Abstract: A study was made of the reactions of nickel dipivaloyimethide with the following reagents: tirphenylmethyl chloride, benzoyl chloride, [rho]-chloro and [rho]-methyl benzoyl chloride. Infrared spectra of the easily hydrolyzed product of tritylation seem to indicate that enol ether, the product of O-alkylation, is formed. the acyl halides reactor to give the triketones. the latter have been characterized by spectra and C, H, analysis. the kinetics of all the reactions studied were … more
Date: July 1959
Creator: Johnson, Kenneth Eugene & Hammond, George Simms, 1921-2005
Partner: UNT Libraries Government Documents Department
open access

Reconnaissance for Uranium in Spain (1955-1957)

Description: Discussing a joint field reconnaissance undertaken for uranium in Spain
Date: July 9, 1959
Creator: Keys, W. S. & Henderson, James G.
Partner: UNT Libraries Government Documents Department
open access

Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes

Description: Development of a fabrication process and the manufacture of 95 PRTR process tubes demonstrates that the commercial fabrication of high quality Zircaloy-2 pressure tubing is feasible.
Date: July 31, 1959
Creator: Knecht, R. L.
Partner: UNT Libraries Government Documents Department
open access

In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)

Description: Report documenting two in-pile loop experiments conducted at the Battelle Research Reactor-Gas Cooled Reactor (BRR-GCR). These experiments test heat transfer calculations and the behavior of the fuel element under severe thermal-cycling conditions.
Date: July 2, 1959
Creator: Nakazato, S.; Williams, P. M. & Wilson, W. D.
Partner: UNT Libraries Government Documents Department
open access

Hydrologic and Tracer Studies in Mohawk River at Knolls Atomic Power Laboratory

Description: Preface: In 1948, the U.S. Geological Survey, in cooperation with the Atomic Energy Commission, initiated a study of the hydraulics and hydrology of Mohawk River in the vicinity of the Knolls Atomic Power Laboratory (KAPL) near Schenectady, N.Y. The purpose of this study was to determine the probable effects of release of low concentrations of radioactive wastes from the Laboratory to Mohawk River.
Date: July 1959
Creator: Simpson, Eugene Sidney; Beetem, W. A. & Ruggles, F. H., Jr.
Partner: UNT Libraries Government Documents Department
open access

The Chattanooga Shale of Tennessee as a Source of Uranium: Final Report

Description: From major objective: The over-all aim of the study has been to obtain a thorough geologic picture of the Chattanooga shale in the area under consideration, with emphasis upon stratigraphic relationships and associated special problems from which, in turn, implications may be obtained as to the origin and age of the formation and possibly the source of the uranium. The study has not been aimed primarily at exploration for uranium and its economic aspects.
Date: July 1, 1959
Creator: Stockdale, Paris B. & Klepser, Harry J.
Partner: UNT Libraries Government Documents Department
open access

Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report

Description: From preface: This report covers Phase I of the authorized work, consisting of determination of the specific reactor concept and size for the most economic reactor, preparation of a reference design of the most promising concept and estimated capital and generating costs, evaluation of the variations in cost as a function of unit size, and evaluation of the reductions in ultimate costs for a power station having multiple units of the same type.
Date: July 1959
Creator: U.S. Atomic Energy Commission. Division of Reactor Development.
Partner: UNT Libraries Government Documents Department
open access

Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant

Description: "This study is one of four initiated in 1958 by the Division of Reactor Development, U.S. Atomic Energy Commission, to assess the feasibility of power generation through the use of certain types of nuclear reactors. These studies are available from the Office of Technical Services, U.S. Department of Commerce, Washington 25, D.C."
Date: July 1959
Creator: U.S. Atomic Energy Commission. Division of Reactor Development.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen