Reactor Automatic Control and Load Swing Test. Test Results DL-S-144 (T-554924). Section I. Second Performance
Description:
The purpose of this test was to determine the controlling ability of the Reactor Power and Temperature Control System and to determine the operational characteristics of the station during load swings after change of operating conditions from 523 F, 2000 psi, to 500 F, 1800 psi. The Reactor Power and Temperature Control System satisfactorily controlled rod movements to maintain all primary plant parameters within their individual limits during steady state operation and during ramp function loa…
more
Date:
March 25, 1959
Creator:
Mafrica, Roces
Partner:
UNT Libraries Government Documents Department