Search Results

Primary view of 300,000-KWE SGR Nuclear Power Plant of Current Technology
Renard, J.; Peckinpaugh, C. L. & Aronstein, R. E.
August 1, 1960
Primary view of Accurate Nuclear Fuel Burnup Analyses; First Quarterly Report, (December 1961 - February 1962)
Rider, B. F.
April 1, 1962
Primary view of Accurate Nuclear Fuel Burnup Analyses; Second Quarterly Progress Report, (March - May 1962)
Rider, B. F.
July 1, 1962
Primary view of Accurate Nuclear Fuel Burnup Analysis Quarterly Progress Report: Seventh Quarter, June 1963 - August 1963
Rider, B. F.; Ruiz, C. P.; Peterson, J. P., Jr.; Luke, P. S., Jr. & Smith, F. R.
September 1, 1963
Primary view of Analog Simulation of the Hanford N-Reactor Plant, Part 1: Description of the Overall Simulation Model
Swanson, C. D.; Coughren, K. D.; Dionne, P. J. & Thieme, G. G.
September 1, 1964
Primary view of Application of Nuclear Power Plants (SNAP Units) to the Manned Orbiting Research Laboratory (MORL)
Botts, W. V.; Marko, M.; McCourt, P. E.; Keshishian, V.; Piccot, A. R. & Budney, G. S.
February 1, 1965
Primary view of Automatic Control of T7 Tanker Boiling Water Reactor Propulsion System: Preliminary Design and Economic Evaluation
U.S. Atomic Energy Commission
September 1, 1960
Primary view of Boiling Depressurization Transients
Halfen, F. J. & Berganzoli, F.
August 1, 1964
Primary view of The Continuous Neutron Flux Monitor Project: An Interim Report
Smith, Charles R. F. & Springer, Thomas H.
August 1, 1964
Primary view of Design and Feasibility Study of a Pebble Bed Reactor-Steam Power Plant
unknown creator
May 1, 1958
Primary view of Development of High-Temperature Electrical Ground Test Heaters for the SNAP 10A Program
Blevitt, R.; Paine, G. & Sudar, S.
March 1, 1965
Primary view of Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 2
Quinn, E. P.
April 1, 1963
Primary view of The Effects of Chemical Impurities on the Quality of Rolled Uranium Rod
Saller, Henry A.; Keeler, J. R. & Cuddy, L. J.
October 1, 1954
Primary view of The Elimination of Microwave Reflections
Beard, David
February 1, 1955
Primary view of Engineering Evaluation of a Mixed Alloy Fuel Element Irradiated at Elevated Temperatures in the SRE
Ballif, J. L.; Hayward, B. R. & Walter, J. W.
June 1, 1960
Primary view of Evaluation of Irradiated OMRE Fuel Elements First Core Loading
Walter, J. H.; Leirich, J. F. & Calkins, G. D.
March 1, 1960
Primary view of Evaluation of Zirconium Hydride as Moderator in Integral, Boiling Water-Superheat Reactors
Gylfe, J. D.; Rood, H.; Greenleaf, J.; Balkwill, K.; Prem, L. & Goldfisher, L.
March 1, 1962
Primary view of EVESR Nuclear Superheat Fuel Development Project: Third Quarterly Report, December 1962-February 1963
Pennington, R. T.
March 1, 1963
Primary view of Experimental Organic Cooled Reactor : Conceptual Design
Huffman, John R.; Nyer, W. E. & Rainwater, J. H.
December 1, 1959
Primary view of Feasibility Study, Optimum Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission, Idaho Operations Office
ACF Industries Incorporated. Nuclear Products - ERCO Division.
April 1, 1958
Primary view of Final Design of Sodium-Heated, Modular, Steam Generators for the SCTI
Casey, D. F.; Hammer, J. J.; Logan, D. & Williams, M. C.
February 1, 1965
Primary view of Final Report: Investigation of Boiling Flow Regimes and Critical Heat Flux
Suo, M.; Bergles, Arthur E.; Doyle, Edward F.; Clawson, L. & Goldberg, P.
March 1, 1965
Primary view of Final Safeguards Summary Report for the Piqua Nuclear Power Facility
unknown creator
August 1, 1961
Primary view of Flight Data and Results of Radiochemical Analyses of Filter Samples Collected During 1961 and 1962
Feely, Herbert W.; Friend, James P.; Krey, Philip W. & Russell, Barbara A.
January 1, 1965
Back to Top of Screen