Search Results

Primary view of Army Package Power Reactor APPR-1 Operating Manual and Inspection and Service Manual
Alco Products (Firm)
February 1958
Primary view of Design Analysis of a Prepackaged Nuclear Power Plant for an Ice Cap Location
Alco Products (Firm)
January 15, 1959
Primary view of X-Ray Fluorescence Tables: Program Description
Amsbury, W. P.; Lee, W. W.; Rowan, J. H. & Walden, G. E.
July 20, 1964
Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis
Anderson, J. K. & Winegardner, W. K.
February 1962
Primary view of Halogen Collector Test Program
Arthur D. Little, Inc.
March 1, 1960
Primary view of Fast Flux Test Facility Studies Progress Report: April 1965
Astley, E. R.
April 1965
Primary view of Final Design Report: DR-1 Gas Loop
Baars, R. E.
March 1961
Primary view of Heavy-Water-Moderated Power Reactors: a Status Report
Babcock, Dale Friend
March 1960
Primary view of Development of Continuous Jet Impaction Method for Determining Air-Borne Contaminants
Baurmash, L.; Curtis, L.; Bryan, F. A. & Cassen, B.
1949
Primary view of A Continuous Water Monitor for Detecting PPM Quantities of Alkali Metals
Been, Julian F.
June 20, 1955
Primary view of Geophysical Seismic Evaluation Study at Hanford
Brown, Ruth E. & Raymond, John R.
December 1964
Primary view of Construction Completion Report: CAI-816, 100-N Reactor Plant
Buckner, C. L.
October 15, 1964
Primary view of Salt Bath Heat Transfer Rates for Uranium Plate
Burditt, R. B.
February 1, 1962
Primary view of Metallurgy Research Operation: Quarterly Progress Report, January - March 1965
Cadwell, J. J.; Bierlein, T. K.; Bement, A. L.; Dillon, R. L. & Wheeler, R. G.
April 15, 1965
Primary view of Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV
Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
March 30, 1961
Primary view of Radiological Aspects of SNAPTRAN 2/10A-3 Destructive Test
Cordes, O. L.; Bird, R. P.; Dinneen, G. A. & Fielding, J. R.
January 1965
Primary view of Advanced Test Reactor Burnout Heat Transfer Tests
Croft, M. W.
January 1964
Primary view of Routine Testing and Calibration Procedures for Multichannel Pulse Analyzers and Gamma-Ray Spectrometers
Crouch, D. F. & Heath, R. L.
November 1, 1963
Primary view of Summary Report of Design Criteria for a Thermal Flux Liquid Metal Package Loop in the Advanced Test Reactor
Ebasco Services Incorporated
March 1963
Primary view of Fast Reactor Fuel Cycle Costs and Temperature Coefficients of Reactivity for PuO2-SS and PuO2-UO2
Edwards, J. J.; Fischer, E. A.; Jens, W. H.; Nims, J. B.; Palmer, R. G.; Shoudy, A. A. et al.
April 25, 1963
Primary view of Superposition of Forced and Diffusive Flow in a Large-Pore Graphite
Evans, R. B., III; Truitt, J. & Watson, G. M.
1961
Primary view of Pulse Amplifier Manual
Fairstein, E.
1962
Primary view of Post-Test Physical, Chemical and Metallurgical Analysis of SNAPTRAN-3 Fuel
Fletcher, R. D.
June 1965
Primary view of Cubic Spline, a Curve Fitting Routine
Fowler, A. H.
1963
Back to Top of Screen