Search Results

open access

Reactor Development Program Progress Report: April 1963

Description: Report issued by the Argonne National Laboratory discussing progress made by the Reactor Development Program during April 1963. Reactor physics, experiments, and safety studies are presented. This report includes tables, and illustrations.
Date: May 15, 1963
Creator: Adams, R. M. & Glassner, A.
Partner: UNT Libraries Government Documents Department
open access

Reactor Development Program Progress Report: March 1963

Description: Report issued by the Argonne National Laboratory discussing progress made by the Reactor Development Program during March 1963. Reactor physics, experiments, and safety studies are presented. This report includes tables, and illustrations.
Date: April 15, 1963
Creator: Adams, R. M. & Glassner, A.
Partner: UNT Libraries Government Documents Department
open access

Hot-Pressure Bonding of OMR Fuel Plates

Description: Abstract: An alluminum-clad low-enrichment, uranium-alloy fuel element of flat plate configuration has been proposed for the Organic Moderated Reactor (OMR).
Date: November 15, 1959
Creator: Alm, G. V.; Binstock, M. H. & Garrett, E. E.
Partner: UNT Libraries Government Documents Department
open access

Analysis of Stresses in Bellows

Description: Abstract: Design charts and systematic design forms are presented for simplified calculations to check the number of convolutions and thickness required to limit the deflection and pressure stress range in three types of bellows.
Date: October 15, 1964
Creator: Anderson, W. F.
Partner: UNT Libraries Government Documents Department
open access

Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 3: July-December 1963

Description: Progress report for the Piqua Reactor Operations Analysis Program describing observations and analyses at the Piqua Nuclear Power Facility (PNPF). The program goals are to monitor operations and collect data in order to ensure that the plant's operation is safe, to improve design and performance, to evaluate the performance and lifetime of the plant's components and systems, to evaluate plant safety and safeguards, and to disseminate all information to the scientific community.
Date: July 15, 1964
Creator: Auleta, J. J.
Partner: UNT Libraries Government Documents Department
open access

Criticality-Accident Dosimetry Studies

Description: Experiments were carried out to (1) explore possibilities for developing a less expensive device than the Hurst threshold detector unit (TDU) for monitoring possible accidental critical reactions in uranium-processing facilities, (2) to study the precision and accuracy of the TDU, and (3) to evaluate the ORNL film badge in mixed neutron-gama radiation fields.
Date: October 15, 1964
Creator: Bailey, J. C.
Partner: UNT Libraries Government Documents Department
open access

Metallurgical Aspects of SRE Fuel Element Damage Episode

Description: Abstract: An investigation of the metallurgical aspects of the SRE fuel element episode, that occurred July 26, 1959, has been completed.
Date: October 15, 1961
Creator: Ballif, J. L.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of Coolant Impurity Removal Equipment at the OMRE

Description: Abstract: The experimental application of centrifugal clarification, precoat filtration, conventional filtration, and adsorption to the removal of impurities from a bypass stream of irradiated reactor coolant at the Organic Moderated Reactor Experiment is described and evaluated.
Date: October 15, 1964
Creator: Barbour, P. & Davis, W. W.
Partner: UNT Libraries Government Documents Department
open access

Mechanical Properties of Zircaloy-2 Weld Metal

Description: Abstract: Zircaloy-2 weld metal, obtained by inert gas non-consumable-electrode welding, was subjected to tensile, strain fatigue, and creep-rupture testing.
Date: April 15, 1961
Creator: Beitscher, S.
Partner: UNT Libraries Government Documents Department
open access

Mechanical Properties of Zircaloy-2 - Niobium - Oxygen Alloys

Description: Introduction: The effects of temperature on the mechanical properties of Zircaloy-2 containing up to 7.5 wt % niobium and 3500-ppm oxygen were studied and are presented herein.
Date: January 15, 1963
Creator: Bibb, A. E. & Fascia, J. R.
Partner: UNT Libraries Government Documents Department
open access

Carbide Fuel Development: Phase 1 Report, Period of May 15 to September 15, 1959

Description: From foreword: This report describes the work accomplished including the Conceptual Design task and the initial results of the tasks on Facility Design and Fabrication, Fuel Fabrication and Evaluation, and Fuel Reprocessing.
Date: October 15, 1959
Creator: Bolomey, R.; Lazerus, S.; Sapir, J.; Sofer, G.; Steinmetz, H.; Strasser, A. et al.
Partner: UNT Libraries Government Documents Department
open access

SNAP 10A Structural Analysis

Description: Abstract: this report discusses and summarizes all stress analysis done on the SNAP 10A system; it also mentions many of the structural tests which were accomplished.
Date: July 15, 1964
Creator: Boulanger, J. R.
Partner: UNT Libraries Government Documents Department
open access

Construction Completion Report: CAI-816, 100-N Reactor Plant

Description: Report from Hanford Laboratories concerning "the design and construction of the 100-N Reactor and heat dissipation plant complete with the necessary auxiliaries" (p. 2). Details of its construction and the plant's systems and instrumentation are described as well as economic considerations.
Date: October 15, 1964
Creator: Buckner, C. L.
Partner: UNT Libraries Government Documents Department
open access

An Advanced Sodium-Graphite Reactor Nuclear Power Plant

Description: Abstract: This report describes an advanced sodium-cooled, graphite-moderated nuclear power plant which utilizes high-pressure, high-temperature steam to generate electricity at a high thermal efficiency.
Date: March 15, 1960
Creator: Churchill, J. R. & Renard, J.
Partner: UNT Libraries Government Documents Department
open access

Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 4: January-June 1964

Description: Progress report for the Piqua Reactor Operations Analysis Program describing observations and analyses at the Piqua Nuclear Power Facility (PNPF). The program goals are to monitor operations and collect data in order to ensure that the plant's operation is safe, to improve design and performance, to evaluate the performance and lifetime of the plant's components and systems, to evaluate plant safety and safeguards, and to disseminate all information to the scientific community.
Date: December 15, 1964
Creator: Cole, H. S.; Hausknecht, D. F.; Jenkins, O. G., Jr.; Lew, D. E.; Mandel, H.; Pearson, E. N. et al.
Partner: UNT Libraries Government Documents Department
open access

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen