Search Results

open access

PRTR second generation shim assembly

Description: From introduction: "This document discusses the design, fabrication, assembly, and testing of a second generation shim rod assembly, and testing of a second generation shim rod assembly prototype for use in the Plutonium Recycle Test Reactor."
Date: November 1964
Creator: Rasmussen, D. E.
Partner: UNT Libraries Government Documents Department
open access

Experimental Studies of Transient Effects in Fast Reactor Fuels

Description: An experimental program to evaluate the performance of FCR and EFCR fuel during transient operation is outlined, and the initial series of tests are described in some detail. Test results from five experiments in the TREAT reactor, using 1-in. OD SS-clad UO₂ fuel specimens, are compared with regard to fuel temperatures, mechanical integrity, and post-irradiation appearance. Incipient fuel pin failure limits for transients are identified with maximum fuel temperatures in the range of 7000 deg F.… more
Date: November 15, 1962
Creator: Field, J. H.
Partner: UNT Libraries Government Documents Department
open access

NS Savannah Upgrading Analog Computer Analysis

Description: From abstract: "This work amplified previous design studies by considering accidents of greater severity, automatic limiting devices to preclude safety action, and more realistic parameters based on operating experience."
Date: November 1962
Creator: Rosser, R. M.
Partner: UNT Libraries Government Documents Department
open access

The Influence of Design and Production Parameters on Fabrication Costs of Nuclear Reactor Fuel Elements

Description: The objectives for this study were to determine fuel fabrication and assembly costs in a large nuclear power industry for several reactors, fuel rod sizes, and fuel materials.
Date: November 1, 1961
Creator: Stein, P. E.; Ayers, A. C.; Braatz, R. J.; Bradford, C. M.; Holt, V. D. & Mattie, G. P.
Partner: UNT Libraries Government Documents Department
open access

SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I

Description: Abstract: The results of activity buildup studies in the SM-1 performed during Core I lifetime (June 3, 1957 to April 28, 1960) are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Radiation levels after reactor shutdown are presented, as well as mathematical equations used to account for the observed activity levels. The data have shown that Co60 is the major contributor to radiation levels in… more
Date: November 30, 1960
Creator: Bergmann, C. A.; Bergen, C.; Cox, J. F.; Chupak, J. & Grant, L. G.
Partner: UNT Libraries Government Documents Department
open access

Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak

Description: Review of previous work is presented in addition to the results of recent studies concerning loss of primary coolant when the system is cold and pressurized and the problem of supplying adequate cooling following the injection of light water.
Date: November 15, 1960
Creator: Wittenbrock, N. G. & Muraoka, J.
Partner: UNT Libraries Government Documents Department
open access

SM-2 Critical Experiments : CE-1

Description: Abstract: Critical experiment studies were performed, varying the parameters U235, B10 and metal to water ratio, in the SM-2 7 x 7 core configuration with 38 stationary elements and seven control rods of the SM-1 (APPR-1) type. An experimental mock-up of the SM-1 was assembled using the basic SM-2 fuel plates. Excellent agreement between the SM-1 boron loading, determined by chemical analysis, and the SM-1 mock-up boron loading, for equivalent bank positions, was noted. Several SM-2 mock-ups, … more
Date: November 30, 1959
Creator: Noaks, J. W.; McCool, W. J.; Robinson, R. A.; Schrader, E. W. & Weiss, S. H.
Partner: UNT Libraries Government Documents Department
open access

Plating Thickness Tester

Description: An electromagnetic eddy current instrument is described that is capable of measuring copper and nickel plating 1 to 8 mils thick plated on bismuth mandrils of various sizes and shapes.
Date: November 15, 1957
Creator: Fitch, C. E., Jr.
Partner: UNT Libraries Government Documents Department
open access

Production of Zirconium at Y-12

Description: Abstract: "A general description is given of the permanent zirconium plant at Y-12. Equipment is described and materials of construction are listed. Photographs illustrating principal equipment and reduced construction drawings are also presented. Operating conditions and costs information are listed."
Date: November 17, 1955
Creator: Ramsey, J. W. & Whitson, W. K., Jr.
Partner: UNT Libraries Government Documents Department
open access

Separation of Zirconium & Hafnium : Proposal for Construction & Operation of Zirconium Production Plant

Description: Abstract: A re-evaluation of the cost of producing essentially hafnium free zirconium as zirconium oxide at a rate of 150,000-200,000 pounds zirconium per year by solvent extraction of the metal thiocyanates in a permanent plant has been made. Using part of the present temporary facilities, the cost, with five year amortization of the plant, will be $3.15 per pound zirconium. A by-product of the mixed oxides of hafnium and zirconium, having at least fifty percent hafnium and perhaps as high as … more
Date: November 17, 1955
Creator: Googin, J. M. & Strasser, G. A.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen