Search Results

Primary view of A 1.5 Mwe Thermionic Reactor Space Power System
Smith, C. K. & Parkinson, R. Y.
October 31, 1966
Primary view of 1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan
Ferguson, J. E.
October 3, 1997
Primary view of 1/12-Scale mixing interface visualization and buoyant particle release tests in support of Tank 241-SY-101 hydrogen mitigation
Eschbach, E. J. & Enderlin, C. W.
October 1, 1993
Primary view of 1/12-Scale scoping experiments to characterize double-shell tank slurry uniformity: Test plan
Bamberger, J. A. & Liljegren, L. M.
October 1994
Primary view of 1. Mono((8)annulene)Uranium(4) half-sandwich complexes, 2. Novel syntheses of symmetrically substituted cyclooctatetetraenes
Boussie, T. R.
October 1, 1991
Primary view of 2-D emittance equation with acceleration and compression
Hahn, K. D. & Smith, L.
October 1, 1988
Primary view of 3-D Micro-Scale Machining Implementation
Boucher, Christopher L.
October 20, 2008
Primary view of 3-D Microprobe Metrology
Swallow, Kevin
October 14, 2008
Primary view of 3-D numerical analysis of a high-gain free-electron laser
Gallardo, J.C.
October 19, 1988
Primary view of 3-D Target Location from Stereoscopic SAR Images
Doerry, Armin W.
October 1, 1999
Primary view of 4.5 Meter high level waste canister study
Calmus, R.B., Westinghouse Hanford, Richland, WA
October 1, 1997
Primary view of 4 MW upgrade to the DIII-D fast wave current drive system
deGrassie, J. S.; Pinsker, R. I. & Cary, W. P.
October 1, 1993
Primary view of 04 nuclear safety: pressure piping crack monitoring detection of metal overstress by acoustic emission. Progress report, July-September 1966
Hutton, P H
October 28, 1966
Primary view of 4-wave mixing for phase-matching free nonlinear optics in quantum cascade structures : LDRD 08-0346 final report.
Chow, Weng Wah; Wanke, Michael Clement; Allen, Dan G.; Yang, Zhenshan & Waldmueller, Ines
October 1, 2010
Primary view of 5 kWe reactor TE reflector sector drive actuator design summary
Donelan, L.E.
October 1, 1972
Primary view of 6 GeV light source project cost estimating procedure
unknown creator
October 23, 1985
Primary view of The 7 by 10 Foot Wind Tunnel of the National Advisory Committee for Aeronautics
Harris, Thomas A.
October 22, 1931
Primary view of 7-GeV Advanced Photon Source Instrumentation Initiative. Conceptual Design Report
Argonne National Laboratory
October 1992
Primary view of The "8(a) Program" for Small Businesses Owned and Controlled by the Socially and Economically Disadvantaged: Legal Requirements and Issues
Manuel, Kate M. & Luckey, John R.
October 12, 2012
Primary view of The 9/11 Commission and a National Counterterrorism Center: Issues and Options for Congress
Masse, Todd
October 22, 2004
Primary view of The 9/11 Commission and a National Counterterrorism Center: Issues and Options for Congress
Masse, Todd
October 6, 2004
Primary view of 9/11 Commission: Current Legislative Proposals for U.S. Immigration Law and Policy
Garcia, Michael John & Wasem, Ruth Ellen
October 18, 2004
Primary view of 9/11 Commission Recommendations: Changes to the Presidential Appointment and Presidential Transition Processes
Hogue, Henry B.
October 19, 2004
Primary view of 9/11 Commission Recommendations: Intelligence Budget
Nicola, Thomas J.
October 23, 2004
Back to Top of Screen