This system will be undergoing maintenance April 23rd between 9:00AM and 12:00PM CDT.

Search Results

Primary view of BOILING NUCLEAR SUPERHEATER (BONUS) POWER STATION. Supplementary Study. Extrapolation to Large Central Station Integral Nuclear Superheat Plant
unknown creator
October 31, 1962
Primary view of Tests of a Vapor-Space Feed Nozzle for Calcining Aluminum Nitrate Solutions in a Fluidized Bed
Lohse, G. E.
October 31, 1962
Primary view of Effects of Major Parameters on Cycle Efficiency and Cost for a Gas-Cooled Reactor Turbine Power Plant
Miskell, R. V.
October 5, 1962
Primary view of Improved Zirconium Alloys Quarterly Report: July - September 1962
Weinstein, Daniel & Holtz, F. C.
October 12, 1962
Primary view of Contaminant Effects Study : Phase Report, January 5 to September 15, 1962
Lieberman, A.
October 9, 1962
Primary view of Delayed Failure Hydrogen Embrittlement of Zirconium : Summary Report, September 15, 1961 to September 14, 1962
Weinstein, Daniel & Holtz, F. C.
October 10, 1962
Primary view of Evaluation of the Blake Sodium Resistivity Meter
Atomic Power Development Associates
October 15, 1962
Primary view of Irradiation Processing Department Monthly Report: September 1962
Hanford Atomic Products Operation. Irradiation Processing Department.
October 12, 1962
Primary view of NS Savannah Replacement Control Rod Drives Safeguards Report. Volume I. Description
Wascher, Robert E.
October 1, 1962
Primary view of NS Savannah Replacement Control Rod Drives Safeguards Report. Volume II. Description of System Modifications and Hazards Analysis
Wascher, Robert E.
October 1962
Primary view of Effect of 1200ºF Sodium on Austenitic and Ferritic Steels Progress Report: September 1962
Andrews, R. C.; Barker, K. R. & Werner, R. C.
October 19, 1962
Primary view of Parahydrogen 7090 subroutines
Pierce, B. L.
October 1, 1962
Primary view of KER loop 1 tube temperatures
Agar, J. D.
October 1, 1962
Primary view of Chemical Processing Department Monthly Report: September 1962
Hanford Atomic Products Operation. Chemical Processing Department.
October 23, 1962
Primary view of Hanford Laboratories Operation Monthly Activities Report: September 1962
Hanford Laboratories
October 15, 1962
Primary view of Yankee Core Evaluation Program Quarterly Progress Report: June-September 1962
Westinghouse Electric Corporation. Atomic Power Division.
October 26, 1962
Primary view of Automatic Foil Activity Counting Facility and Data-Reduction Program
Plumlee, K. E. & Wiggins, M. T.
October 1962
Primary view of Presentation to the Atomic Energy Commission and the Air Force, June 14, 1962
unknown creator
October 1, 1962
Primary view of Preliminary functional design information for prototype ETS test operations console
Margulies, A.E. & Kendziorek, M.
October 31, 1962
Primary view of Criteria of the Post-Operative Cells, E-MAD Facility
unknown creator
October 15, 1962
Primary view of Reorificing proposal D Reactor
Hollifield, P. J.
October 19, 1962
Primary view of Time behavior of a critical reactor pulsed with a large square wave source
Barnett, C.
October 2, 1962
Primary view of Technical criteria and bases for a zirconium-tubed K Reactor
Curtiss, D. H.
October 19, 1962
Primary view of A pluto-slam design to fit a maximum fineness ratio missile into a Polaris launch tube
Cornwell, R. S.
October 12, 1962
Back to Top of Screen