Calibration Tunnel for High Speed
Description:
"For the investigation of measuring instruments at higher speeds up to a Mach number 0.7 a tunnel with closed test section was built in 1942 which was as simple and cheap as possible. The blower was a radial blower with straight sheet vanes of 800-millimeter diameter the tips of which were bent backward a little. The blower sucks the air through a honeycomb of diameter 1.2 meter with wide meshes" (p. 1).
Date:
October 1946
Creator:
Pretsch, J.
Partner:
UNT Libraries Government Documents Department