Search Results

Primary view of Investigation of the Availability of Geothermal Energy for the Demineralization of Saline Water
Research and Development Association. School of Mines.
July 1959
Primary view of Some Research on the Lift and Stability of Wing-Body Combinations
Purser, Paul E. & Fields, E. M.
July 2, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Evaluation of NaK as the Primary Coolant for the SNAP II System
Wallerstedt, R.
July 10, 1959
Primary view of Design and Test Analysis of the Magnetic Jacking Positive Latch Control Rod Drive Mechanism
Balog, L. J.; Bishop, A. A. & Widmer, Thomas F.
July 1959
Primary view of Hydrologic and Tracer Studies in Mohawk River at Knolls Atomic Power Laboratory
Simpson, Eugene Sidney; Beetem, W. A. & Ruggles, F. H., Jr.
July 1959
Primary view of The Chattanooga Shale of Tennessee as a Source of Uranium: Final Report
Stockdale, Paris B. & Klepser, Harry J.
July 1, 1959
Primary view of The Sayapullo Mine Area, Cajamarca Department, Peru
Gabelman, John W.
July 1959
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of High Temperature Corrosion Study Interim Report for the Period November 1958 Through May 1959
Hale, C. F.; Barber, E. J.; Bernhardt, H. A. & Rapp, K. E.
July 28, 1959
Primary view of LOW COST CERAMIC FUEL ELEMENTS BY ISOSTATIC PRESSING
Fugardi, J. & Zambrow, J.L.
July 1, 1959
Primary view of Power Reactor Fuel Reprocessing: Mechanical Phase
Klima, B. B.
July 1, 1959
Primary view of REPORT OF FIRE IN LABORATORY HOOD, WING I, BUILDING 4500, MAY 22, 1959
Hungerford, T W & Lain, J E
July 30, 1959
Primary view of A SURVEY OF ORGANIC SOLVENTS FOR THE ELECTRO-DEPOSITION OF PLUTONIUM
Porter, J.A.
July 1, 1959
Primary view of Recent Developments in Graphite
Kosiba, W. L.
July 17, 1959
Primary view of Time Dependence of the Beam in the 86-Inch Cyclotron
Goodman, C. D.
July 29, 1959
Back to Top of Screen