Search Results

Primary view of Accurate Nuclear Fuel Burnup Analyses; Second Quarterly Progress Report, (March - May 1962)
Rider, B. F.
July 1, 1962
Primary view of An Alpha Scintillation Tester for Uranium Surface Contamination of N-Reactor Fuel
Jackson, C. N., Jr.
July 1963
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: March 1964
Oak Ridge National Laboratory
July 1964
Primary view of Atom Arrangements in Some Iron-Aluminum Solutions, Report No. 1
Houska, C. R. & Averbach, B. L.
July 12, 1962
Primary view of Calculations of the Madelung Constant and Inverse Twelfth Power Repulsion Factors for the Wurtzite Crystal Structure
Gehman, William G.
July 25, 1965
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of The Closest Packing of Spheres (A Unifying Basis for Crystal Structures)
Gehman, William G.
July 30, 1961
Primary view of Consolidated Edision Thorium Reactor Physics Design
Barringer, H. S.; Flickinger, R. B. & Spetz, S. W.
July 1960
Primary view of Consolidated Edison Thorium Reactor Critical Experiments with Oxide Fuel Pins
Batch, M. L. & Snidow, N. L.
July 1960
Primary view of Consolidated Edison Thorium Reactor:  Reactor Vessel Internal Components Design
Ficor, J.; Collings, D. M.; Sandrock, R. J. & Kalen, D. D.
July 1960
Primary view of Control Blade Worth by Partial Water Height and Soluble Boron Methods
MacKinney, Arland L. & Ball, Russell M.
July 1960
Primary view of Cost Study of a 100-Mw(e) Direct-Cycle Boiling Water Reactor Plant
Bullinger, C. F. & Harrer, J. M.
July 1960
Primary view of The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results
Zelezny, W. F.
July 12, 1963
Primary view of Development of Pulsed Neutron Application to Power Reactor Start-Up Procedures. Fifth Quarterly Progress Report, April 1-June 30, 1963
Garelis, Edward & Meyer, P.
July 15, 1963
Primary view of Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 3
Sorlie, T.
July 1, 1963
Primary view of Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 7
Howard, C. L.
July 1, 1964
Primary view of EDP Procedures in Technical Library Operations
Griffin, Hillis L.
July 30, 1963
Primary view of Evaluation of Thorium Fuels for the Heavy Water Organic Cooled Reactor
unknown creator
July 1966
Primary view of Experimental Determination of Contact Conductance for Some Stainless Steel Contacts
Adamantiades, Achilles
July 1962
Primary view of An Experimental Investigation of Two-Phase, Two-Component Flow in a Horizontal, Converging-Diverging Nozzle
Vogrin, Joseph A., Jr.
July 1963
Primary view of Experimental Radiation Measurements in Conventional Structures: Part 1, Radiation Measurements in Two Two-Story and Three One-Story Typical Residential Structures Before and After Modification
Burson, Z. G.
July 1966
Primary view of Extrusion of Uranium Tubes
Fisher, R. E.
July 1961
Primary view of Fabrication Modification Development for OMRE Third Core Loading
Peters, E. & Binstock, M. H.
July 15, 1961
Back to Top of Screen