Search Results

Primary view of Cascade: a review of heat transport and plant design issues
Murray, K.A. & McDowell, M.W.
July 31, 1984
Primary view of Measurements of satellite refrigerator compressor power consumption and efficiency
Hentges, M.; James, A.; Peterson, T. & Urso, M.
July 30, 1984
Primary view of Radiation doses in granite around emplacement holes in the Spent Fuel Test - Climax. Final report
Van Konynenburg, R.A.
July 26, 1984
Primary view of RHIC Aperture
Parzen, G.
July 25, 1984
Primary view of Integration of advanced preparation with coal liquefaction. Third quarterly technical progress report, April 1-June 30, 1984
Steedman, W.G.; Longanbach, J.R.; Muralidhara, H.S.; Folsom, D.W. & Droege, J.W.
July 24, 1984
Primary view of Temperature rise in iron beam position monitors
Nelson, W. R. & Jenkins, T. M.
July 24, 1984
Primary view of EP-toxicity testing of mercury removal resin grout
Mersman, K. E.
July 18, 1984
Primary view of Reaction of the Topopah Spring Tuff with J-13 water at 120{sup 0}C
Oversby, V.M.
July 18, 1984
Primary view of Report on the Implementation of the Grace Commission Recommendations
United States. Office of Cabinet Affairs.
July 18, 1984
Primary view of MOD silver metallization for photovoltaics. Quarterly technical report, March 1, 1984-May 31, 1984. [Metalloorganic deposition]
Vest, G.M. & Vest, R.W.
July 16, 1984
Primary view of The solubility of uranium hexafluoride in perfluoroethers
Barber, E. J.
July 15, 1984
Primary view of Stress studies in EFG. Quarterly progress report, January 1, 1984-March 31, 1984
Kalejs, J.P.
July 15, 1984
Primary view of Displacement Damage in the First Structural Wall of an Inertial Confinement Fusion Reactor: Dependence on Blanket Design
Meier, Wayne R.
July 13, 1984
Primary view of Investigation of non-intrusive radiometer for entrained gasifier temperature measurement. First quarterly report, October 30, 1983-January 30, 1984
Fairchild, P.; Gat, N. & Witte, A.B.
July 13, 1984
Primary view of Containment purge and vent valve program. Final report
Archbold, P.
July 12, 1984
Primary view of Dual tube counter flow heat exchanger. Final report. WEC Project No. 513
unknown creator
July 12, 1984
Primary view of Linac quadrupole connections
Stiening, R.
July 12, 1984
Primary view of North and South Damping Ring nomenclature
Linebarger, W. & Silva, J.
July 12, 1984
Primary view of SLC nomenclature for beamline components
Paterson, J. & Silva, J.
July 12, 1984
Primary view of Metal finishing and vacuum processes groups, Materials Fabrication Division progress report, March-May 1984
Dini, J.W.; Romo, J.G. & Jones, L.M.
July 11, 1984
Primary view of Modification of the code BEAMCORR, and some simulation results of the magnet and achromat misalignments for the SLC South Arc
Shoaee, H. & Kheifets, S.
July 11, 1984
Primary view of A technical and economic evaluation of thermal spallation drilling technology
unknown creator
July 10, 1984
Primary view of Composite-bed reactor for upgrading coal-derived liquids. Quarterly report No. 3, April 1-June 30, 1984
Crynes, B.L. & Seapan, M.
July 9, 1984
Primary view of Improved seal for geothermal drill bit. Final technical report
Evans, R.F.
July 6, 1984
Back to Top of Screen