Search Results

Primary view of ''Ballistic damping'': a proposed method of stabilizing resonant ion cyclotron modes
Post, Richard F.
July 31, 1978
Primary view of Basalt Waste Isolation Program: monthly report
Deju, R.A.
July 31, 1978
Primary view of Cadmium sulfide/copper heterojunction cell research. Technical progress report No. 1, September 30--December 31, 1977
Szedon, J. R.; Shirland, F. A. & Biter, W. J.
July 31, 1978
Primary view of Detroit Lakes energy systems study: Phase I feasibility. Final report, February 1, 1978--July 31, 1978
unknown creator
July 31, 1978
Primary view of GRIPS Plan
unknown creator
July 31, 1978
Primary view of NTS terminal waste storage. Monthly technical status report
unknown creator
July 31, 1978
Primary view of Phase 2 of the array automated assembly task for the low cost silicon solar array project. Third quarterly report, April 1, 1978--June 30, 1978
Szedon, J. R.; Campbell, R. B.; Ghosthagore, R. N.; Hanes, M. H. & Yoldas, B. E.
July 31, 1978
Primary view of PREPARATION OF CONDUCTING SOLID MIXTURES, Technical Report
Spokas, J. J.
July 31, 1978
Primary view of Thermal and other tests of photovoltaic modules performed in natural sunlight
Stultz, J. W.
July 31, 1978
Primary view of Thermal and other tests of photovoltaic modules performed in natural sunlight
Stultz, J.W.
July 31, 1978
Primary view of Western Gas Sands Project. Quarterly basin activities report
unknown creator
July 31, 1978
Primary view of Western gas sands project: status report
unknown creator
July 31, 1978
Primary view of Geothermal development and land use/energy planning by the State of California and its political subdivisions
unknown creator
July 30, 1978
Primary view of Geothermal development and land use/energy planning by the State of California and its political subdivisions
unknown creator
July 30, 1978
Primary view of Silicon-on-ceramic solar cell development. Solar cell development for the cell development task of the Low-Cost Solar Array Project. Quarterly report No. 1, February 15--June 30, 1978
Chapman, P W; Grung, B L & Zook, J D
July 30, 1978
Primary view of Streamlining the Federal geothermal leasing and permitting process: background papers, analysis and recommendations
unknown creator
July 30, 1978
Primary view of Streamlining the Federal geothermal leasing and permitting process: background papers, analysis and recommendations
unknown creator
July 30, 1978
Primary view of Brayton isotope power system, phase I. Final report
unknown creator
July 28, 1978
Primary view of Electropolishing as a Decontamination Process: Progress and Applications.
Allen, R. P.; Arrowsmith, H. W.; Charlot, L. A. & Hooper, J. L.
July 28, 1978
Primary view of EVALUATION OF THE PREDICTIVE CAPABILITY OF THE FINITE ELEMENT METHOD: II. PROJECT SALT VAULT - THERMO/VISCOELASTIC SIMULATION
Ratigan, Joe L. & Callahan, Gary D.
July 28, 1978
Primary view of Levelized Nuclear Fuel Cycle Cost Program user's guide
unknown creator
July 28, 1978
Primary view of Terrorism: Information as a Tool for Control A Summary of Issues and Compilation of Document
Becker, Louise Giovane; Browne, Marjorie Ann; Cavanagh, Suzanne & Kaiser, Frederick M.
July 28, 1978
Primary view of Terrorism: Information as a Tool for Control. A Summary of Issues and Compilation of Documents
Becker, Louise Giovane; Browne, Marjorie Ann; Cavanagh, Suzanne & Kaiser, Frederick M.
July 28, 1978
Primary view of Tritium waste control: April--June 1978. [Catalytic exchange detritiation; liquid waste decontamination; fixation in polymer impregnated concrete; management of high specific activity tritiated wastes]
unknown creator
July 28, 1978
Back to Top of Screen