Search Results

Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 1/N
Coleman, S.
March 1, 1980
Primary view of 1 Outreach, Education and Domestic Market Enhancement 2 Export Promotion and Assistance
Geothermal Energy Association
March 15, 2004
Primary view of 2-mm microwave interferometer
Futch, A. H. & Mortensen, W. K.
March 1, 1977
Primary view of 2-Page Summary for Neptunium solubility in the Near-field Environment of A Proposed Yucca Mountain Repository
Sassani, D.; van Luik, A. & Summerson, J.
March 29, 2005
Primary view of 3-D Cavern Enlargement Analyses
Ehgartner, Brian L. & Sobolik, Steven R.
March 2002
Primary view of 3-D Nonlinear Calculations of Resistive Tearing Modes
Hicks, H. R.; Holmes, J. A.; Lee, D. K.; Carreras, B. & Waddell, B. V.
March 1, 1981
Primary view of 3-D nonlinear evolution of MHD instabilities
Bateman, G.; Hicks, H. R. & Wooten, J. W.
March 1, 1977
Primary view of A 3 TeV on 3 TeV proton-proton dedicated collider for Fermilab
Teng, L.C.
March 30, 1988
Primary view of The 5- by 7-meter wind tunnel of the DVL
Kramer, M.
March 1936
Primary view of 5-gpm In-Pile Thorium Oxide Slurry Loop Development, Runs 14 Through 16 In Loop L-4-248, And Filtration Of Thorium Oxide Slurry With Sintered Filters
Baker, J. M.; Jones, D. T. & Savage, H. C.
March 7, 1960
Primary view of 6 GeV synchrotron x-ray source: Conceptual design report. Supplement A - characteristics of the insertion devices for the 6 GeV synchrotron source
unknown creator
March 1, 1986
Primary view of 6 GeV synchrotron x-ray source: Conceptual design report. Supplement B - conceptual design of proposed beam lines for the 6 GeV light source
unknown creator
March 1996
Primary view of 6 kv Capacitor Charging Supply
Miller, D. M.
March 15, 1962
Primary view of 6 kv Capacitor Charging Supply
Miller, D. M.
March 15, 1962
Primary view of The “8(a) Program” for Small Businesses Owned and Controlled by the Socially and Economically Disadvantaged: Legal Requirements and Issues
Luckey, J. R. & Manuel, K. M.
March 18, 2010
Primary view of 8(a) Program: Fourteen Ineligible Firms Received $325 Million in Sole-Source and Set-Aside Contracts
United States. Government Accountability Office.
March 30, 2010
Primary view of 08-ERD-071 Final Report: New Molecular Probes and Catalysts for Bioenergy Research
Thelen, M. P.; Rowe, A. A.; Siebers, A. K. & Jiao, Y.
March 7, 2011
Primary view of 9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees
Palmer, Betsy
March 23, 2005
Primary view of 10-75-kWe-reactor-powered organic Rankine-cycle electric power systems (ORCEPS) study. Final technical report
unknown creator
March 30, 1977
Primary view of 10-MW demonstration of the gas suspension absorption process at TVA`s Center for Emissions Research. Final report
unknown creator
March 1995
Primary view of 16 Channel ECL repeater
Graupman, Dan
March 7, 1990
Primary view of 20-ton HE Cratering Experiments in Desert Alluvium: Final Report, May 1962
Vortman, Luke J. & MacDougall, H. R.
March 1960
Back to Top of Screen