This system will be undergoing maintenance March 20th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of Energy Dependence Determinations in the 60-180 KeV Range with an X-Ray Machine of Varying Output
Shambon, Arthur; Zila, Albert & Sanna, Robert S.
February 1963
Primary view of Experimental Radiation Measurements in Conventional Structures: Part 2. Comparison of Measurements in Above-Ground and Below-Ground Structures From Simulated and Actual Fallout Radiation
Burson, Z. G. (Zolin G.)
February 1963
Primary view of A Computer Program for Calculating Neutron Interaction Between Cylindrical Storage Containers
Lanes, Stephen J. & Rosenberg, Theodore
February 1963
Primary view of Ionization Chambers for Environmental Radiation Measurements
Shambon, Arthur; Lowder, Wayne M. & Condon, William J.
February 1963
Primary view of Determination of Beryllium in Urine by Ion Exchange Separation and Fluorimetric Measurement
Sutton, Doris C.
February 1963
Primary view of Operating Characteristics of the Lauterbach and Dautrebande Aerosol Generators
Mercer, T. T.; Tillery, M. I. & Flores, M. A.
February 1963
Primary view of Aeroradioactivity Survey and Geology of the Gnome (Carlsbad) Area, New Mexico and Texas (ARMS-I)
MacKallor, Jules A.
February 1963
Primary view of Study of Requirements and Suitability of Available Reactors for Fast Fuel Tests
Doyle, T. A.; Duffy, J. G.; Jens, W. H.; McHugh, W. E.; Page, E. M. & Warberg, H. S.
February 23, 1963
Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
Aerojet-General Corporation
February 15, 1963
Primary view of Instrumentation and Controls Division Annual Progress Report: for Period Ending September 1, 1962
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 6, 1963
Primary view of Porosity gain from increase in core radius and fuel mass in Tory II-C
Kane, W.E. & Cole, A.G.
February 14, 1963
Primary view of Control rod studies
Cole, A.
February 28, 1963
Primary view of Yankee Core Evaluation Program Quarterly Progress Report: October-December 1962
Westinghouse Electric Corporation. Atomic Power Division.
February 1963
Primary view of Performance of Cesium Thermionic Diodes Operated in Series-Parallel Circuits
Holland, J. W.
February 1, 1963
Primary view of Development of Batch Formulation Equations for Graphite Fuel Elements
unknown creator
February 26, 1963
Primary view of Comments on Proposed Lasl Ln$sub 2$ System
Kutilek, J.L.
February 1, 1963
Primary view of Deformation Twinning in Face-Centered Cubic Metals. Technical Report No. 1
Venables, J. A.
February 1, 1963
Primary view of The Diffusion of Lithium in Aluminum
Costas, L. P.
February 28, 1963
Primary view of SNAP (SYSTEMS FOR NUCLEAR AUXILIARY POWER) TECHNICAL BRIEFS. PART 8. AEROSPACE SAFETY
unknown creator
February 21, 1963
Primary view of The Large Component Test Loop-Description and Operating Capabilities
Atz, R. W.
February 18, 1963
Primary view of Burnout Conditions for Single Rod in Annular Geometry, Water at 600 to 1400 PSIA
Janssen, E. & Kervinen, J. A.
February 1963
Primary view of NS Savannah Safeguards Report for 80-MW Operation
Luken, R. C.
February 1, 1963
Primary view of Comments on E-Mad Phase II Drawings Received February 6, 1963
Svasek, A.J.
February 13, 1963
Primary view of Comments on E-MAD Phase II drawings received between 2/14/63 and 2/19/63
Svasek, A.J.
February 21, 1963
Back to Top of Screen