Search Results

Primary view of Fuels and Materials Development Program Quarterly Progress Report, September 30, 1968
Oak Ridge National Laboratory. Metals and Ceramics Division.
February 1969
Primary view of Instrumentation and Controls Division Annual Progress Report, September 1, 1968
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 1969
Primary view of Methods, System Optimization, and Safety Studies for a 1000 MegaWatt Sodium-Cooled Fast Reactor: Task 3 and 5 report of 1000 MegaWatt Liquid Metal Fast Breeder Reactor Follow-On Work
General Electric Company
February 1969
Primary view of Addendum to the Spert IV Hazards Summary Report: Capsule Driver Core
Miller, R. W.; McCardell, Richard K. & Lagier, T. F.
February 1965
Primary view of Static Tests of Corrosion Inhibitors for Aluminum and Carbon Steel
Richman, R. B.
February 1965
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of Advanced Test Reactor Servo Regulator Rod Test Program
Pickett, R. T., III
February 1964
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Alco Products (Firm)
February 28, 1962
Primary view of BWR Reference Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.
Bradley, P. L. & Coombe, J. R.
February 28, 1962
Primary view of PWR Preliminary Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant
U.S. Atomic Energy Commission
February 25, 1962
Primary view of Summary Report of Physics Measurements on SM-1 Core I
Weiss, S. H.
February 6, 1962
Primary view of Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII
Pomeroy, D. L.
February 1, 1962
Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis
Anderson, J. K. & Winegardner, W. K.
February 1962
Primary view of Results of Air-Water and Steam-Water Tests on Radial Vane Steam Separator Models
Riesland, J. I.
February 1962
Primary view of Salt Bath Heat Transfer Rates for Uranium Plate
Burditt, R. B.
February 1, 1962
Primary view of Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3
Hasse, Robert A. & Zegger, John L.
February 28, 1961
Primary view of Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator
Alco Products (Firm).
February 15, 1961
Primary view of Oak Ridge National Laboratory Intrumentation and Controls Division Annual Progress Report: 1960
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 3, 1961
Primary view of Evaluation of Iron- and Nickel-Base Alloys for Medium and High Temperature Reactor Applications, Part 1
Pessl, H. J.
February 1961
Primary view of Critical Mass Studies of Plutonium Solutions
Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
February 15, 1960
Back to Top of Screen