Search Results

Primary view of Plutonium Recycle Critical Facility: Final Safeguards Analysis
Anderson, J. K. & Winegardner, W. K.
February 1962
Primary view of Evaluation of Iron- and Nickel-Base Alloys for Medium and High Temperature Reactor Applications, Part 1
Pessl, H. J.
February 1961
Primary view of Preliminary Report on the Use of Activated Carbon as a Catalyst for the Dissolved Oxygen-Aqueous Hydrazine Reaction
Demmit, T. F.
February 24, 1960
Primary view of Development of a Welding Process for End Closures on NPR and KER Fuel Element
Corey, T. B.; DeWitt, D. E. & Nelson, I. V.
February 22, 1960
Primary view of Once Through Decontamination Studies- Interim Report No. 2
Hokenson, J. F. & Perrigo, L. D.
February 18, 1960
Primary view of Critical Mass Studies of Plutonium Solutions
Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
February 15, 1960
Primary view of The Irradiated Rupture Prototype (IRP) Design
Neibaur, G. E. & Stice, N. D.
February 15, 1960
Primary view of Disposition of Contaminated Processing Equipment at Hanford Atomic Products Operation 1958-1959
Kingsley, P. S.
February 12, 1960
Primary view of Hydraulic System Flow Decay Relations During Loss of External Power
Love, W. J.
February 11, 1960
Primary view of Gas-Graphite Reactions. I. Thermal and Microwave Oxidation of Various Reactor-Grade Graphites*
Clark, T. J.
February 10, 1960
Primary view of Evaluation of Fretting Corrosion of ZR-2
Lobsinger, R. J.
February 5, 1960
Primary view of KAPL-120-8A Test Assembly Thermocouple Failure.
Dearing, F. E.
February 5, 1960
Primary view of Interim Report -- The Retention of Particles in Ducts Transporting Aerosol Streams
Postma, A. K. & Schwendiman, L. C.
February 1, 1960
Primary view of Chemical Reactivity of Uranium Monocarbide and Uranium Mononitride with Water at 100°C.
Newkirk, H. W.
February 26, 1959
Primary view of Scratch Depth Measurement Methods
Brenden, B.B.
February 26, 1959
Primary view of Detailed Procedure for K Reactors Rear ace Decontamination by Chemical Flush or the Rear Crossheaders, Pigtails and Nozzles as Authorized by the Production Test Authorization IP-239-N.
Crossman, W.A.
February 25, 1959
Primary view of Random Loading of E-Metal Dissolver
Ketzlach, M.
February 25, 1959
Primary view of Quarterly Report- July, August, September 1958 Plutonium Fuels Development Plutonium Metallurgy Operation
Wick, O.J.
February 24, 1959
Primary view of Division of Reactor Development Programs Monthly Report- January 1959
McEwen, L.H.
February 15, 1959
Primary view of The Nuclear Safety of Fissile Materials
Clayton, E.D.
1959-02-11?
Primary view of Concentration and Final Purification of Neptunium by Anion Exchange
Ryan, J.L.
February 10, 1959
Primary view of Flow Decay After an Electrical Power Outage in the PRTR
Muraoka, J.
February 6, 1959
Primary view of A Gamma-COunting Method For the Determination of U-235 In Enriched Uranium
Upson, U. L. & Miller, D. G.
February 1, 1959
Primary view of Heat Transfer in Radiant- Heat Spray Calcination
Johnson, B.M., Jr.
February 1, 1959
Back to Top of Screen