Search Results

Primary view of UPDATE: nuclear power program information and data, July-September 1981
/NBM--6011986, DOE
January 1, 1981
Primary view of METHODOLOGY, ASSUMPTIONS, AND BASELINE DATA FOR THE REPOSITORY DESIGN AND OPERATION, RAIL CORRIDORS, AND HEAVY TRUCK ROUTES, CLARK COUNTY, NEVADA, LINCOLN COUNTY, NEVADA, NYE COUNTY, NEVADA, "REST OF NEVADA", STATE OF NEVADA
/a, n
January 25, 2002
Primary view of Focal Plane Metrology for the LSST Camera
A Rasmussen, Andrew P.; Hale, Layton; Kim, Peter; Lee, Eric; Perl, Martin; Schindler, Rafe et al.
January 10, 2007
Primary view of IN-VIVO DIAGNOSIS OF CHEMICALLY INDUCED MELANOMA IN AN ANIMAL MODEL USING UV-VISIBLE AND NIR ELASTIC SCATTERING SPECTROSCOPY: PRELIMINARY TESTING.
A'AMAR, C.; LEY, R. & AL, ET
January 1, 2001
Primary view of Comparison of ICEPEL predictions with single elbow flexible piping system experiment
A-Moneim, M.T. & Chang, Y.W.
January 1, 1978
Primary view of Computer simulation of LMFBR piping systems. [Accident conditions]
A-Moneim, M.T.; Chang, Y.W. & Fistedis, S.H.
January 1, 1977
Primary view of Quadratic electroweak corrections for polarized Moller scattering
A. Aleksejevs, S. Barkanova, Y. Kolomensky, E. Kuraev, V. Zykunov
January 1, 2012
Primary view of Buffer Chemical Polishing and RF Testing of the 56 MHz SRF Cavity
A., Burrill
January 1, 2009
Primary view of Energy Recovery Linac: 5 Cell 704 MHz SRF Cavity
A., Burrill
January 1, 2010
Primary view of Energy Recovery Linac: SRF Electron Gun
A., Burrill
January 1, 2010
Primary view of Plasma Micro-Stability Analysis for the RHIC Electron Beam Cooler
A., Hershcovitch
January 1, 2004
Primary view of Energy Recovery Linac: Magnetic Measurement of the ERL Magnets
A., Jain
January 1, 2010
Primary view of Expected Harmonics (Version 1.0) in BNL-built LHC Dipoles
A., Jain
January 1, 1998
Primary view of Development and evaluation of systems for controlling parallel high di/dt thyratrons
A., Litton. & McDuff, G.
January 1, 1982
Primary view of HIGH ALUMINUM HLW (HIGH LEVEL WASTE ) GLASSES FOR HANFORDS WTP (WASTE TREATMENT PROJECT)
AA, KRUGER; BW, BOWAN; I, JOSEPH; H, GAN; WK, KOT; KS, MATLACK et al.
January 4, 2010
Primary view of MELT RATE ENHANCEMENT FOR HIGH ALUMINUM HLW (HIGH LEVEL WASTE) GLASS FORMULATION FINAL REPORT 08R1360-1
AA, KRUGER; KS, MATLACK; W, KOT; IL, PEGG; I, JOSEPH; T, BARDAKCI et al.
January 4, 2010
Primary view of Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)
ADAMS, WADE C
January 28, 2013
Primary view of Monte Carlo simulations of phosphate polyhedron connectivity in glasses
ALAM,TODD M.
January 1, 2000
Primary view of Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer
ANDREWS, J.E.
January 27, 2000
Primary view of Prediction of Coal ash leaching behavior in acid mine water, comparison of laboratory and field studies
ANNA, KNOX
January 10, 2005
Primary view of DEWATERING TREATMENT SCALE-UP TESTING RESULTS OF HANFORD TANK WASTES
AR, TEDESCHI
January 23, 2008
Primary view of FULL SCALE TESTING TECHNOLOGY MATURATION OF A THIN FILM EVAPORATOR FOR HIGH-LEVEL LIQUID WASTE MANAGEMENT AT HANFORD - 12125
AR, TEDESCHI; JE, CORBETT; RA, WILSON & J, LARKIN
January 26, 2012
Primary view of Laser Safety and Hazard Analysis for the Trailer (B70) Based AURA Laser System
AUGUSTONI, ARNOLD L.
January 1, 2003
Primary view of Laser Safety and Hazardous Analysis for the ARES (Big Sky) Laser System
AUGUSTONI, ARNOLD L.
January 1, 2003
Back to Top of Screen