This system will be undergoing maintenance April 23rd between 9:00AM and 12:00PM CDT.

Search Results

Primary view of Berkeley Proton Linear Accelerator
Alvarez, Luis W.; Bradner, Hugh; Gordon, Hayden; Panofsky, Wolfgang K. H.; Richman, Chaim & Woodyard, John R.
November 30, 1948
Primary view of Program Study Report Plutonium Fuel Cycle
Albaugh, F. W. & Fryar, R. M.
July 30, 1956
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of SM-1 Research and Development Program : Final Report on Fission Product Activity in the SM-1 Primary Coolant, Task XIII
Hasse, Robert A.
June 30, 1959
Primary view of Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant
Linenberger, G. A.
September 30, 1959
Primary view of SM-2 Critical Experiments : CE-1
Noaks, J. W.; McCool, W. J.; Robinson, R. A.; Schrader, E. W. & Weiss, S. H.
November 30, 1959
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design
Alco Products (Firm)
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis
Alco Products (Firm)
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications
Alco Products (Firm)
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance
Alco Products (Firm)
September 30, 1960
Primary view of SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I
Bergmann, C. A.; Bergen, C.; Cox, J. F.; Chupak, J. & Grant, L. G.
November 30, 1960
Primary view of Hazards Report for the SM-1 Core II With Special Components
Coombe, J.; Lee, D.; Segalman, I. & Robertson, R.
March 30, 1961
Primary view of Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV
Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
March 30, 1961
Primary view of Extended SM-2 Critical Experiments : CE-2
McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
June 30, 1961
Primary view of SM-2 Full Scale Flow Studies Termination Report
Christenson, J. A.; Richards, W. M. S. & Davidson, S. L.
July 30, 1961
Primary view of PM-2A Core II Zero Power Experiment
Walthousen, L. D.; Mageean, J. V.; Raby, T. M. & Lee, D. H.
March 30, 1962
Primary view of Preliminary Technical Report SM-1 Core III with Type 3 Elements
Inglima, J. N.; Beam, R. H.; Davidson, S. L. & Edgar, E. C.
March 30, 1962
Primary view of Summary Report of Analysis of Physics Measurements Performed on SM-1 Core I
Lois, L.; Paluszkiewicz, S.; Fried, B. E. & Beam, R. H.
March 30, 1962
Primary view of EDP Procedures in Technical Library Operations
Griffin, Hillis L.
July 30, 1963
Primary view of Design and Economic Evaluation of Fixed Blankets for Fast Reactors
Klickman, A. E.; Ball, G. L.; Edwards, J. J.; Jens, W. H.; Segal, B. M.; Stanford, R. E. L. et al.
August 30, 1963
Primary view of Quarterly Progress Report Metallurgy Research Operation: July, August, September, 1963
unknown creator
December 30, 1963
Back to Top of Screen