Search Results

Primary view of Feed Materials Production Center Summary Technical Report: July 1, 1963-September 30, 1963
unknown creator
October 28, 1963
Primary view of Feasibility of the use of induction heating equipment for Pilot Plant development work
Powers, H. G.
August 28, 1963
Primary view of Loading, operating conditions, and water shutoff times for a charge of twelve 17-inch N inner fuel tubes or twelve 18-inch U-2 w/o Zr elements, PT-IP-536-A and PT-IP-536-A, Supplement B
Kratzer, W. K. & Wise, M. J.
January 28, 1963
Primary view of Internal graphite moderator forces study, C and K Reactors
Cooley, D. E.
October 28, 1963
Primary view of Uniformly Reactive Uranium Dioxide from a Single Oxidation-Reduction Cycle
Orrick, N. C.; Jones, C. G.; Hale, C. F.; Barber, E. J. & Rapp, Karl E.
August 28, 1963
Primary view of Economic analysis of 10-inch and 12-inch fuel element production for three separate conditions
Grubb, F. W.
January 28, 1963
Primary view of STATUS AND PROGRESS REPORT FOR THORIUM FUEL CYCLE DEVELOPMENT FOR PERIOD ENDING DECEMBER 31, 1962
Ferguson, D.E. comp.
October 28, 1963
Primary view of MOUND LABORATORY PROGRESS REPORT FOR JUNE 1963
Eichelberger, J.F.; Grove, G.R. & Jones, L.V.
June 28, 1963
Primary view of The Diffusion of Lithium in Aluminum
Costas, L. P.
February 28, 1963
Primary view of Automatic Neutronics Calibration
Kendziorek, W.M.
January 28, 1963
Primary view of Radiation Survey of the Reactor Vessel Head. Core 1, Seed 3. Test Evaluation
unknown creator
February 28, 1963
Primary view of Nucleon-Meson Cascade Calculations: Transverse Shielding for a 45-Gev Electron Accelerator (Part III)
Alsmiller, R. G., Jr.; Alsmiller, F. S. & Murphy, J. E.
March 28, 1963
Primary view of ANNEALING OF GAMMA RAY INDUCED CHANGES IN ANTIMONY DOPED GERMANIUM
Pigg, J.C.
May 28, 1963
Primary view of Laboratory development of a process for recovering uranium from Rover fuel by combustion, liquid-phase chlorination with hexachloropropene, and aqueous extraction
Gens, T.A. & Borne, T.B.
June 28, 1963
Primary view of Nucleon-Meson Cascade Calculations: Transverse Shielding for a 45-Gev Electron Accelerator. Part Ii
Alsmiller, R. G., Jr.; Alsmiller, F. S. & Murphy, J. E.
February 28, 1963
Primary view of Summary of BeO Development Work for the Experimental Beryllium Oxide Reactor Program
Johnson, D. E.
June 28, 1963
Primary view of DESCRIPTION OF PRINTED OUTPUT FROM INTRANUCLEAR CASCADE CALCULATION
Bertini, H.W.
May 28, 1963
Primary view of A PRELIMINARY EXAMINATION OF THE FORMATION AND UTILIZATION OF TEXTURE AND ANISOTROPY IN ZIRCALOY-2
Picklesimer, M.L.
February 28, 1963
Primary view of CRITICALITY STUDY-FIVE PERCENT $sup 235$U ENRICHED FUEL FABRICATION
Ketzlach, N.
August 28, 1963
Primary view of DCX-2 PERFORMANCE CURVES
Rankin, M. & Fowler, T. K.
January 28, 1963
Primary view of Effect of Massive Neutron Exposure on the Distortion of Reactor Graphite
Helm, J. W. & Davidson, J. M.
May 28, 1963
Primary view of Reduction of Plutonium (VI) to Plutonium(III) and (IV) by Sodium Nitrite
Colvin, C. A.
October 28, 1963
Primary view of FUEL ELEMENT GRAPPLE AND FUEL ELEMENT HOLD-DOWN LATCH DEVELOPMENT--LARGE SGR FUEL HANDLING
Ybarra, R.M.
December 28, 1963
Primary view of Nuclear subsystem control and its integration into engine control
unknown creator
May 28, 1963
Back to Top of Screen