Search Results

Primary view of EEN-333, revised getter flash procedure
Brown, W.C.
June 28, 1960
Primary view of Reactivity Absorbed by Xenon-135 in the SRE
Woodruff, R. W.
January 28, 1960
Primary view of Evaluation and Design Heavy Water Moderated Power Reactor Plants
unknown creator
April 28, 1960
Primary view of Structural Response and Permanent Displacement Measurements
Sievers, R. H., Jr. & Stacy, A. R.
October 28, 1960
Primary view of Optimization Studies on Paste-Fueled Fast Reactors
Zetterbaum, J. M. & Kerlin, T. W.
December 28, 1960
Primary view of HIGH-TEMPERATURE COMPATIBILITY OF Al$sub 2$O$sub 3$-, BeO-, AND METAL- COATED UO$sub 2$ PARTICLES WITH GRAPHITE AND COKE
Gerds, A.F. & Smalley, A.K.
November 28, 1960
Primary view of TEST OF HRT-CP MULTICLONE NO. 1 FOLLOWING REMOVAL FROM REACTOR CELL
Yarbro, O. O.
June 28, 1960
Primary view of Determination of Interstitial Solid-Solubility Limit in Tantalum and Identification of the Precipitate Phases
Vaughan, D.A.; Stewart, O.M. & Schwartz, C.M.
October 28, 1960
Primary view of Bubble Chamber Safety Meeting
Harrer, J. M.
June 28, 1960
Primary view of Chemical Techinology Division, Unit Operations Section Monthly Progress Report, April 1960
Whatley, M E; Haas, P A; Horton, R W; Ryon, A D; Suddath, J C & Watson, C D
July 28, 1960
Primary view of SM-2 SINGLE ELEMENT FINAL TEST REPORT
Krause, P.S.
October 28, 1960
Primary view of Gamma-Ray and Fast Neutron Heat Deposition in the EGCR Core
Nephew, E. A.
October 28, 1960
Primary view of Hydraulic Tests of the 5-Rod and Dummy Sre Fuel Elements
Begley, R. J.
April 28, 1960
Primary view of Isotopic Analysis of Boron as Trimethyl Borate
Abernathey, R. M.
January 28, 1960
Primary view of LEACHING OF TAMALPAIS DEBRIS
Bond, W. D. & Clark, W. E.
January 28, 1960
Primary view of AN IMPROVED NUCLEAR MEASURING PRINCIPLE. Quarterly Progress Report No. 3 Covering the Period from December 1, 1959 to March 1, 1960
Burgwald, G.M.
March 28, 1960
Primary view of A Chemical Composition and Process for Removing Oxide and Scale From Aluminum Metals and Aluminum Alloys
Richman, R. B. & Larrick, A. P.
March 28, 1960
Primary view of An Improved Nuclear Measuring Principle : Quarterly Progress Report No. 3 Covering the Period from December 1, 1959 to March 1, 1960
Burgwald, G. M. & Stone, C. A.
March 28, 1960
Primary view of Accelerator Beam Pulsing System With Extremely Wide Range of Pulse Lengths and Pulse Repetition Rates
Aaland, Kristian
June 28, 1960
Primary view of Inventory radioactive liquid waste to ground 200 Areas, 1945--1959
Brown, G. D. & McConiga, M. W.
July 28, 1960
Primary view of Expansion to 4.0 capacity factor: Purex Engineering Study
Doud, E.
October 28, 1960
Primary view of Contoured I&E sleeves
Burgess, C. A.
June 28, 1960
Primary view of Engineering bases for power levels and exposures - April, 1960, thru December, 1960
Graves, S. M.
April 28, 1960
Primary view of Analysis of E-N loadings
Zimmer, W. H.
December 28, 1960
Back to Top of Screen