Search Results

Primary view of A Study of Alternatives to the Davis (West Virginia) Pumped Storage Project: Volume 1 - Draft
ICF Incorporated
December 22, 1980
Primary view of Addendum to "Flow Stability in Heat Transfer Matrices Under Boiling Conditions"
Fraas, A. P.
March 22, 1961
Primary view of The Concentration of Peroxide in Uranyl Sulfate Solutions at Incipient Precipitation
Gilpatrick, L. O.; Jolley, H. R.; Kelly, M. J.; Silverman, M. D. & Watson, G. M.
October 22, 1959
Primary view of Notes on Heat Transfer in the ORR Core at Powers Greater Than 20 Mw
Wett, J. F.
September 22, 1959
Primary view of Programmers Manual: ORACLE Binary Internal Translator (ORBIT) - Algebraic Programming System for the ORACLE
Grau, A. A.; Feliciano, M.; Caldwell, G. C.; Cooper, E. L.; Culkowski, A. & Harrison, J.
September 22, 1959
Primary view of Primary Plant Control and Instrumentation. Section I. Test Results DL-S-125, T-550079
Shramko, John, Jr.
July 22, 1958
Primary view of The Input Admittance of a Ring Circuit
Rees, J. R.
January 22, 1958
Primary view of TrU Facility - Alpha Box Accessories - Manipulator Operable Spherical Joint Clamp
Klima, B.B.
July 22, 1961
Primary view of Radioactivation Analysis
Leddicotte, G. W.
September 22, 1961
Primary view of Internally Cooled Molten-Salt Reactors
Lackey, M. E.
June 22, 1959
Primary view of Hexone Extraction-Coulometric Titration of Uranium
Blevins, E. L.
June 22, 1959
Primary view of Report of Fire in Laboratory Hood, Wing I, Building 4500
Lain, J. E. & Hungerford, T. W.
May 22, 1959
Primary view of Preliminary Report on 2% U235-Enriched UF4-C25H52 Critical Assemblies
Mihalczo, J. T.; Lynn, J.J.; Scott, Dunlap & Connolly, W. C.
April 22, 1959
Primary view of In-Reactor Autoclave Corrosion Studies II : Autoclave Z-19
Warren, K. S.; Davis, R. J. & Jenks, G. H. (Glenn Herbert), 1916-
March 22, 1957
Primary view of In-Reactor Autoclave Corrosion Studies : LITR I.  Outline of Methods and Procedures
Warren, K. S. & Davis, R. J.
May 22, 1957
Primary view of Summary of Corrosion Data for HRT Mockup Operational Period Ending November 5, 1956
Wacker, R. E. & Griess, J. C.
May 22, 1957
Primary view of Deflection Equations for Various Loading of Circular-Arc Curved Beams
Platus, D. L. & Greenstreet, B. L.
April 22, 1957
Primary view of The Choice in Thorium Oxide Slurries for the Prevention of Caking in Circulating Systems
Lyon, R. N.
April 22, 1957
Primary view of Supplement to: Curve Plotting Routine for the Oracle (57-4-56)
Lietzke, M. P.
October 22, 1957
Primary view of In-Reactor Autoclave Corrosion Studies. II, Autoclave Z18
Warren, K. S.; Davis, R. J. & Jenks, G. H. (Glenn Herbert), 1916-
March 22, 1957
Primary view of HRT Sampler Development
Hannaford, B. A.
January 22, 1957
Primary view of Pressure Drop Along a Fuel Cycle Fuel Assembly - Various Orifice Configurations
Janssen, E. (Engineer) & Kervinen, J. A.
May 22, 1961
Primary view of Pilot Plant Tests on Anaconda Ore From the Grants District, Grants, New Mexico
Hollis, R. F.; Abrams, Charles S.; McArthur, C. K.; Izzo, T. F. & Wilson, H.
July 22, 1954
Primary view of Recovery of Uranium From High Grade Australian Rum Jungle Uranium Ore
George, D'Arcy R.
August 22, 1952
Back to Top of Screen