3(omega) Damage: Growth Mitigation

Description: The design of high power UV laser systems is limited to a large extent by the laser-initiated damage performance of transmissive fused silica optical components. The 3{omega} (i.e., the third harmonic of the primary laser frequency) damage growth mitigation LDRD effort focused on understanding and reducing the rapid growth of laser-initiated surface damage on fused silica optics. Laser-initiated damage can be discussed in terms of two key issues: damage initiated at some type of precursor and r… more
Date: February 22, 2001
Creator: Kozlowski, M; Demos, S; Wu, Z-L; Wong, J; Penetrante, B & Hrubesh, L
Partner: UNT Libraries Government Documents Department
open access

3(omega) Power Balance Procedure on the NIF

Description: This document defines the detailed NIF full system shot procedure to obtain 8% power balance as specified by the SDR002 3.2.1.04. Because the 48 quads of the NIF will be set up over a period of five years, obtaining power balance will naturally be accomplished in two steps. First, as each quad is brought online, the four laser beams within each quad will be tuned by setting the PABTS splitter ratios so that each beam will give the same laser power on target during low energy square pulse shots.… more
Date: January 22, 2001
Creator: Glenzer, S.; Jones, O.; Speck, D. R.; Munro, D.; Lerche, R.; Salmon, T. et al.
Partner: UNT Libraries Government Documents Department
open access

3 Plant Radiation Study Interim Report #5- Part II Data on Gamma Shielding of Special Plutonium Samples

Description: The calculation of shielding the thickness for plutonium is complicated by the many different energies represented in the gamma radiation emitted during decay of the plutonium isotopes. Dose rate predictions are also frequently confused by gamma from varying content of fission product impurities in the plutonium, as well as other gamma radiation induced through alpha and neutron particle absorption within the source material or its environment. After assumptions are made for these many factors… more
Date: October 22, 1959
Creator: Moulthrop, H. A.
Partner: UNT Libraries Government Documents Department
open access

The 7 by 10 Foot Wind Tunnel of the National Advisory Committee for Aeronautics

Description: This report presents a description of the 7 by 10 foot wind tunnel and associated apparatus of the National Advisory Committee for Aeronautics. Included also are calibration test results and characteristic test data of both static force tests and autorotation tests made in the tunnel.
Date: October 22, 1931
Creator: Harris, Thomas A.
Partner: UNT Libraries Government Documents Department
open access

The 9/11 Commission and a National Counterterrorism Center: Issues and Options for Congress

Description: This report examines a number of issues as Congress considers codification of an NCTC. One issue is whether the centralization remedy the commission has recommended fits the problems associated specifically with the 9/11 intelligence failure, and perhaps more broadly, the systematic maladies affecting the Intelligence Community. There are at least four options for congressional consideration: (1) NCTC with intelligence and operational planning duties, (2) NCTC restricted to an intelligence role… more
Date: October 22, 2004
Creator: Masse, Todd
Partner: UNT Libraries Government Documents Department
open access

9/11 Commission Recommendations: A Civil Liberties Oversight Board

Description: This report discusses the recommendation made by the National Commission on Terrorist Attacks Upon the United States (9/11 Commission) regarding the creation of a board within the executive branch to oversee adherence to guidelines on, and the commitment to defend, civil liberties by the federal government.
Date: December 22, 2004
Creator: Relyea, Harold C.
Partner: UNT Libraries Government Documents Department
open access

9/11 Commission Recommendations: A Civil Liberties Oversight Board

Description: From Summary: This report discusses recommendations made by the National Commission on Terrorist Attacks Upon the United States (9/11 Commission) which include: "creation of a board within the executive branch to oversee adherence to guidelines on, and commitment to defend, civil liberties by the federal government."
Date: December 22, 2004
Creator: Relyea, Harold C.
Partner: UNT Libraries Government Documents Department
open access

9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees

Description: On July 22, 2004, the National Commission on Terrorist Attacks Upon the United States, known as the 9/11 Commission, issued its final report, detailing the events up to and including the September 11, 2001 terrorist attacks upon the United States. The 9/11 Commission recommended that the Senate adopt rules requiring hearings and votes to confirm or reject national security nominees within 30 days of their submission at the start of each new presidential administration. Implementing the commissi… more
Date: November 22, 2004
Creator: Palmer, Betsy
Partner: UNT Libraries Government Documents Department
open access

S-20 photocathode research activity. Part I

Description: The goal of this activity has been to develop and implement S-20 photocathode processing techniques at Lawrence Livermore National Laboratory (LLNL) in order to study the physical properties of the photocathode films. The present work is the initial phase of a planned activity in understanding cathode fabrication techniques and the optical/electrical characterization of these films.
Date: November 22, 1983
Creator: Gex, F.; Huen, T. & Kalibjian, R.
Partner: UNT Libraries Government Documents Department
open access

45-Day safety screen results and final report for Tank 241-SX-113, Auger samples 94-AUG-028 and 95-AUG-029

Description: This document serves as the 45-day report deliverable for tank 241-SX-113 auger samples collected on May 9 and 10, 1995. The samples were extruded, and analyzed by the 222-S Laboratory. Laboratory procedures completed include: differential scanning calorimetry; thermogravimetric analysis; and total alpha analysis. This report incudes the primary safety screening results obtained from the analyses. As the final report, the following are also included: chains of custody; the extrusion logbook; sa… more
Date: June 22, 1995
Creator: Sasaki, L.M.
Partner: UNT Libraries Government Documents Department
open access

100 Areas technical activities report: Engineering, August 1947

Description: There were seven charges of metal inspected during the month for corrosion and blistering studies. There were no unusual cases of blistering noted and the corrosion rates were normal for this time of year. Borescopic examination of the graphite packing around the ``B`` Hole in the F Pile revealed that the graphite is no more severely cracked than in the D Pile when it was inspected about a year ago. Examination of the graphite at the downstream and of Tube 1385-D did not indicate that any damag… more
Date: September 22, 1947
Creator: Woods, W. K.
Partner: UNT Libraries Government Documents Department
open access

100 Areas technical activities report: Physics, July 1949

Description: The pile physics group reports on reactivity power coefficients from the production test No. 105-248-P, the water leak in B pile, graphite properties, xenon equations from the B pile shutdown of March 1946, and reactivity balance. The experimental physics group headed by J.M. West reports on graphite testing, the P-11 project, and shielding. The experimental physics group headed by E.B. Montgomery reports on diffusion length measurements in the DR and H piles. (GHH)
Date: August 22, 1949
Creator: Staebler, U. M.
Partner: UNT Libraries Government Documents Department
open access

100-F area unit purge, May 3, 1945

Description: This report discusses the pressure drop on the 100-F unit, as measured on the eight pressure drop tubes, which had increased to 24 lbs./in.{sup 2} above base by May 2. The unit was shut down on May 3 to purge with 50 ppm solids for 1.1 hr. and to take care of necessary maintenance work.
Date: May 22, 1945
Creator: Kiddker, C. P.
Partner: UNT Libraries Government Documents Department
open access

100-K Area electrical power system load and voltage study for project CG-775. Revision

Description: The proposed increased water capacity for 100-K plants will increase the electrical load to be supplied. The load study showed that the capacity of the existing 13.8 kV system is adequate to carry the increased loads proposed for Project CG-775, while for the 5 kV system, an expanded power system is proposed. Likewise, the voltage regulation on the kV system bus will be excessive, and voltage regulators should be added.
Date: February 22, 1960
Creator: Thorson, W. R.
Partner: UNT Libraries Government Documents Department
open access

AZ-101 Mixer Pump Demonstration and Tests Data Management Analysis Plan

Description: This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The an… more
Date: February 22, 2000
Creator: Douglas, D. G.
Partner: UNT Libraries Government Documents Department
open access

105-DR Large Sodium Fire Facility closure activities evaluation report

Description: This report evaluates the closure activities at the 105-DR Large Sodium Fire Facility. The closure activities discussed include: the closure activities for the structures, equipment, soil, and gravel scrubber; decontamination methods; materials made available for recycling or reuse; and waste management. The evaluation compares these activities to the regulatory requirements and closure plan requirements. The report concludes that the areas identified in the closure plan can be clean closed.
Date: April 22, 1996
Creator: Adler, J. G.
Partner: UNT Libraries Government Documents Department
open access

190-C pump capacity

Description: The purpose of this document is to update 190-C pump capacity information previous released in HW-52449{sup 1} and HW-58580{sup 2}. Improvements in motor cooling has resulted in raising the previous 3500 HP limit to 3660 HP{sup 3} thus increasing total pumping capacity.
Date: June 22, 1959
Creator: Watson, D. F.
Partner: UNT Libraries Government Documents Department
open access

200 area weekly report

Description: No Description Available.
Date: December 22, 1955
Partner: UNT Libraries Government Documents Department
open access

234-5 Project specification letter 234-41, 235-41 (Supplement D), Chemical Development Laboratory

Description: This letter itemizes the miscellaneous equipment and supplies not previously specified which should be ordered to equip the 234-5 Chemical Development Laboratory. Equipment currently carried in store stock is not included in this list. The vendor is given only to identify the item or as a suggested source of supply.
Date: October 22, 1948
Creator: Work, J.B.
Partner: UNT Libraries Government Documents Department
open access

241-A evaporator flowsheet users manual

Description: This supporting document presents a description of the 242-A Evaporator flowsheet. Material balances are calculated for feed, slurry, and effluent streams based on input data for the feed stream.
Date: December 22, 1994
Creator: Larrick, A. P.
Partner: UNT Libraries Government Documents Department
open access

300 Area, February 12 through February 18

Description: Extrusion was run on one day, February 2, and a total of 271 billets (178 Type G, 12 type BT, and 81 red band) were processed. Two failures occurred among the red band billets; UM 6610 had begun to melt in the furnace and TX 3323 disintegrated on being extruded through the die. Samples of these billets are being checked chemically and metallurgically in an attempt to ascertain the cause for the hot-short characteristics of these billets. A sample cut from a rod which possessed zero strength (fe… more
Date: February 22, 1946