Search Results

Primary view of A Study of Alternatives to the Davis (West Virginia) Pumped Storage Project: Volume 1 - Draft
ICF Incorporated
December 22, 1980
Primary view of Some Comments on the Ioffe Experiment
Simon, Albert, 1924-
January 22, 1960
Primary view of Reactivity Control By Addition Of Neutron Poisons To Slurry Reactors
Pearson, R. L.; Prince, B. E.; Jeffrey, D. W. & Brassert, W. L.
December 22, 1959
Primary view of Addendum to "Flow Stability in Heat Transfer Matrices Under Boiling Conditions"
Fraas, A. P.
March 22, 1961
Primary view of The Concentration of Peroxide in Uranyl Sulfate Solutions at Incipient Precipitation
Gilpatrick, L. O.; Jolley, H. R.; Kelly, M. J.; Silverman, M. D. & Watson, G. M.
October 22, 1959
Primary view of Notes on Heat Transfer in the ORR Core at Powers Greater Than 20 Mw
Wett, J. F.
September 22, 1959
Primary view of Programmers Manual: ORACLE Binary Internal Translator (ORBIT) - Algebraic Programming System for the ORACLE
Grau, A. A.; Feliciano, M.; Caldwell, G. C.; Cooper, E. L.; Culkowski, A. & Harrison, J.
September 22, 1959
Primary view of Primary Plant Control and Instrumentation. Section I. Test Results DL-S-125, T-550079
Shramko, John, Jr.
July 22, 1958
Primary view of Saturated Water Orifice Tests
Westinghouse Electric Corporation
January 22, 1957
Primary view of The Input Admittance of a Ring Circuit
Rees, J. R.
January 22, 1958
Primary view of Heat Exchanger Design Study for the ISHR
Segaser, C. L.
October 22, 1952
Primary view of Reactor Physics of Teapot. Part V, Proposed Stability Experiment
Kasten, Paul R.
October 22, 1952
Primary view of Enrichment, Plutonium Production Rate and Slurry Costs for D2O-UO3 and H2O-UO3 Slurry Reactors at 250°C
Zerby, Clayton D.
August 22, 1952
Primary view of TrU Facility - Alpha Box Accessories - Manipulator Operable Spherical Joint Clamp
Klima, B.B.
July 22, 1961
Primary view of Radioactivation Analysis
Leddicotte, G. W.
September 22, 1961
Primary view of Internally Cooled Molten-Salt Reactors
Lackey, M. E.
June 22, 1959
Primary view of Hexone Extraction-Coulometric Titration of Uranium
Blevins, E. L.
June 22, 1959
Primary view of Report of Fire in Laboratory Hood, Wing I, Building 4500
Lain, J. E. & Hungerford, T. W.
May 22, 1959
Primary view of Preliminary Report on 2% U235-Enriched UF4-C25H52 Critical Assemblies
Mihalczo, J. T.; Lynn, J.J.; Scott, Dunlap & Connolly, W. C.
April 22, 1959
Primary view of Control of Thorium Oxide Particle Size
Johnsson, K. O. & Ellison, C. V.
January 22, 1959
Primary view of Some Calculations of Diffusion Controlled Thermal Gradient Mass Transfer
Keyes, J. J., Jr.
July 22, 1957
Primary view of In-Reactor Autoclave Corrosion Studies II : Autoclave Z-19
Warren, K. S.; Davis, R. J. & Jenks, G. H. (Glenn Herbert), 1916-
March 22, 1957
Primary view of In-Reactor Autoclave Corrosion Studies : LITR I.  Outline of Methods and Procedures
Warren, K. S. & Davis, R. J.
May 22, 1957
Primary view of Summary of Corrosion Data for HRT Mockup Operational Period Ending November 5, 1956
Wacker, R. E. & Griess, J. C.
May 22, 1957
Back to Top of Screen