Search Results

Primary view of 1.5% boron, stainless steel
Schreiber, J.J.
September 19, 1962
Primary view of 1-MWE Heat Exchangers for OTEC Final Design Report
Sprouse, A.M.
June 19, 1980
Primary view of 3-D numerical analysis of a high-gain free-electron laser
Gallardo, J.C.
October 19, 1988
Primary view of 5 Kwe Reactor T/E Unmanned System Test
Beoletto, J.A.
September 19, 1972
Primary view of 8-Hydroxyquinoline Colorimetric Method for the Determination of Microgram Quantities of Uranium
Lee, D. A. & Woodard, R. W.
November 19, 1947
Primary view of 9/11 Commission Recommendations: Changes to the Presidential Appointment and Presidential Transition Processes
Hogue, Henry B.
October 19, 2004
Primary view of 9/11 Commission Recommendations: Joint Committee on Atomic Energy — A Model for Congressional Oversight?
Davis, Christopher M.
October 19, 2004
Primary view of A 10-Megacycle Transition Binary Counter
Holliday, Dennis
September 19, 1956
Primary view of A 30 MW, 200 MHz Inductive Output Tube for RF Accelerators
Ives, R. Lawrence & Read, Michael
June 19, 2008
Primary view of 40-tube overbore facility location, C Reactor
Nilson, R.: Nechodom, W. S.
April 19, 1961
Primary view of 45-day safety screen results and final report for tank 241-C-202, auger samples 95-Aug-026 and 95-Aug-027
Baldwin, J.H.
June 19, 1995
Primary view of 100 Area excavation treatability study data validation report
Frain, J. M.
May 19, 1994
Primary view of 100 Area process improvement program for the period November 1954--April 1955
Reinker, P. H. & Bupp, L. P.
November 19, 1954
Primary view of 100 Areas: April 9--April 15
Jordan, W. E.
April 19, 1946
Primary view of 100 Areas technical activities report -- Engineering, June, 1948
Woods, W. K.
July 19, 1948
Primary view of 100 Areas technical progress report: Physics, August 1949
Gast, P. F.
September 19, 1949
Primary view of 233-S plutonium concentration facility hazards assessment
Broz, R. E.
December 19, 1994
Primary view of 241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity
Barnes, Travis J.; Gunter, Jason R. & Reeploeg, Gretchen E.
November 19, 2013
Primary view of 242-A Control System device logic software documentation. Revision 2
Berger, J. F.
May 19, 1995
Primary view of 300-Area VOC Program Slug Test Characterization Results for Selected Test/Depth Intervals Conducted During the Drilling of Well 399-3-21
Spane, Frank A.
July 19, 2007
Primary view of 527 Organizations: Reporting Requirements Imposed on Political Organizations after the Enactment of P.L. 106-230
Morris, Marie B.
March 19, 2001
Primary view of 1000-Mwe SGR. 90% ThOâ‚‚, 10% UOâ‚‚ Alternate Fuel Core Thermal and Hydraulic Analysis
Imig, J. K.
February 19, 1964
Primary view of 1000 MWe SGR Parameter Study--Core Thermal and Hydraulic Analysis
Imig, J. K.
November 19, 1963
Primary view of 1958-2006 Precipitation Climatology for Lawrence Livermore National Laboratory Livermore Site and Site 300
Bowen, B M
December 19, 2006
Back to Top of Screen