Search Results

open access

Fusion cross sections and reactivities

Description: Cross section and reactivity data are summarized for several important fusion reactions. Reactivities are included for both Maxwellian plasmas and beam- Maxwellian target fusion. Equations, tabular and also graphical presentations are included for convenience in a variety of applications. (auth)
Date: June 17, 1974
Creator: Miley, G.H.; Towner, H. & Ivich, N.
Partner: UNT Libraries Government Documents Department
open access

Interim low cost 100 GeV ISA

Description: No Description Available.
Date: April 17, 1974
Creator: Month, M.; Blumberg, L.N. & Chasman, R.W.
Partner: UNT Libraries Government Documents Department
open access

LAMP code users guide

Description: No Description Available.
Date: June 17, 1974
Creator: Thompson, P. F.
Partner: UNT Libraries Government Documents Department
open access

Analysis of high-density areas in beryllium hemishells

Description: Small areas of high and low radiographic density in hot-pressed beryllium were studied by macroetching and optical and electron microscopy. The areas were either semispherical or wormlike in shape and were found to be agglomerates of grains markedly coarser or finer than the matrix. (auth)
Date: January 17, 1974
Creator: Lee, O. A. & Riefenberg, D. H.
Partner: UNT Libraries Government Documents Department
open access

Some comments on AGS bunch areas

Description: No Description Available.
Date: July 17, 1974
Creator: Barton, M. Q.
Partner: UNT Libraries Government Documents Department
open access

EPRI geothermal energy R and D 5-year program plan (1975 to 1979)

Description: The recommended EPRI Geothermal Research and Development 5-Year Program Plan has been defined to complement and provide focus for federally sponsored geothermal energy R and D efforts. The scope of the program includes: verification of hydrothermal reservoir capability and low salinity brine heat transfer characteristics at a potential demonstration site followed by design, development and construction of a low salinity hydrothermal demonstration plant in conjunction with an electric utility or… more
Date: October 17, 1974
Creator: Spencer, D.F.
Partner: UNT Libraries Government Documents Department
open access

LMFBR technology. FFTF cover-gas leakage calculation

Description: The FFTF LMFBR is intended to have a near zero release of radioactive gases during normal reactor operation with 1% failed fuel. This report presents calculations which provide an approximation of these cover gas leakages. Data from ongoing static and dynamic seal leak tests at AI are utilized. Leakage through both elastomeric and metallic seals in all sub-assemblies and penetrations comprising the reactor cover gas containment during reactor operation system are included.
Date: June 17, 1974
Creator: Deboi, H.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen