Search Results

Primary view of Microwave Spectral Tables: [Volume 2.] Line Strengths of Asymmetric Rotors
Wacker, Paul F. & Pratto, Marlene R.
December 15, 1964
Primary view of Construction Completion Report: CAI-816, 100-N Reactor Plant
Buckner, C. L.
October 15, 1964
Primary view of Fuel Cycle Program Progress Report: Fifteenth Report, January-June 1964
Howard, C. L.
July 15, 1964
Primary view of Specifications for High Temperature Lattice Test Reactor Building 318 Project CAH-100
Vitro Engineering Company
July 15, 1964
Primary view of Analog Models for HNPF Control and Protection Studies
Dunsmore, C. L.
June 15, 1964
Primary view of Analysis of Stresses in Bellows
Anderson, W. F.
October 15, 1964
Primary view of Criticality-Accident Dosimetry Studies
Bailey, J. C.
October 15, 1964
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 4: January-June 1964
Cole, H. S.; Hausknecht, D. F.; Jenkins, O. G., Jr.; Lew, D. E.; Mandel, H.; Pearson, E. N. et al.
December 15, 1964
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 3: July-December 1963
Auleta, J. J.
July 15, 1964
Primary view of Integral Neutron Thermalization, Annual Summary Report: October 1963-September 1964
Beyster, J. R.; Brown, J. R.; Corngold, N.; Honeck, H. C.; Houston, D. H.; Joanou, G. D. et al.
October 15, 1964
Primary view of Operating Experience with Heat Transfer System Pumps at the Hallum Nuclear Power Facility
Durand, R. E.
June 15, 1964
Primary view of Evaluation of Coolant Impurity Removal Equipment at the OMRE
Barbour, P. & Davis, W. W.
October 15, 1964
Primary view of Radiolysis Products of Polyphenyl Coolants: Part 3, Omre High Boilers
Keen, R. T.; Orr, W. L.; Miller, L. J.; Sullivan, R. J. & Shepard, R. C.
October 15, 1964
Primary view of SNAP 10A-PSM-1: Test Results
Oliva, R. M.
July 15, 1964
Primary view of Boiling Studies for Sodium Reactor Safety: Part 2, Pool Boiling and Initial Force Convection Tests and Analyses
Lurie, H. & Noyes, R. C.
October 15, 1964
Primary view of HNPF Control System Response During Transient Conditions
Shaw, P. F.
June 15, 1964
Primary view of SNAP 10A Structural Analysis
Boulanger, J. R.
July 15, 1964
Primary view of Structural Test on the Final SNAP 10A Prototype System
Henley, H. L. & Dauterman, W. H.
July 15, 1964
Primary view of Stress and Elevated Temperature Fatigue Characteristics of Large Bellows
Winborne, R. A.
September 15, 1964
Primary view of Design of an Experimental Bowable Fuel Element for the SRE
Peckinpaugh, C. L.
October 15, 1964
Primary view of QUICKIE: A Computer Program for Spatially Independent Multigroup Slowing-Down and Thermalization Calculations
Boling, M. & Rhoades, W.
April 15, 1964
Primary view of Hallam Nuclear Power Facility, Reactor Operations Analysis Program: Semiannual Progress Report Number 3, September 1963-February 1964
Darley, D. K.
September 15, 1964
Primary view of HIGH TEMPERATURE RADIATION DAMAGE TO GRAPHITE. PART I. PREPARATION OF GRAPHITES FOR IRRADIATION
Meers, J.T. & Doar, J.F.
April 15, 1964
Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
Aerojet-General Corporation
February 15, 1964
Back to Top of Screen