Construction Completion Report: CAI-816, 100-N Reactor Plant

Description: Report from Hanford Laboratories concerning "the design and construction of the 100-N Reactor and heat dissipation plant complete with the necessary auxiliaries" (p. 2). Details of its construction and the plant's systems and instrumentation are described as well as economic considerations.
Date: October 15, 1964
Creator: Buckner, C. L.
Partner: UNT Libraries Government Documents Department
open access

Decontamination Program Task II. Volume II, Evaluation of Chemical Agents for Nuclear Reactor Decontamination

Description: Abstract: The caustic permanganate-rinse decontamination treatment was investigated. Loop and metallurgical studies were performed to determine optimum operating conditions as well as the metallurgical effects of the treatment. A treatment with 10 percent sodium hydroxide and 5 percent potassium permanganate solution followed by a rinse with a 5 percent ammonium citrate, 2 percent citric acid and 1/2 percent Versene solution was chosen for the decontamination of a stainless steel steam generat… more
Date: February 15, 1959
Creator: Zegger, John L. & Pancer, Guyon P.
Partner: UNT Libraries Government Documents Department
open access

Design Study: Sodium Modular Reactor

Description: This study was undertaken for the USAEC under Contract AT(04-3)-189, Project Agreement No. 6, to investigate desirable features of a sodium cooled, graphite moderated uranium fueled power reactor using the modular concept, and, based on this investigation, evaluate the economic potential of this reactor type.
Date: January 15, 1960
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator

Description: Introduction: This is a final report on the evaluation of Kanigen electroless nickel plating for surfaces in contact with water and steam i a sodium heated AISI Type 316 stainless steel steam generator. The purpose of the coasting was to afford protection from stress corrosion cracking originating on the water-steam side of the unit. It has been concluded that the kanigen coating does not afford adequate protection for the services condition intended. This work was performed as part of the r… more
Date: February 15, 1961
Creator: Alco Products (Firm).
Partner: UNT Libraries Government Documents Department
open access

Experimental Studies of Transient Effects in Fast Reactor Fuels

Description: An experimental program to evaluate the performance of FCR and EFCR fuel during transient operation is outlined, and the initial series of tests are described in some detail. Test results from five experiments in the TREAT reactor, using 1-in. OD SS-clad UO₂ fuel specimens, are compared with regard to fuel temperatures, mechanical integrity, and post-irradiation appearance. Incipient fuel pin failure limits for transients are identified with maximum fuel temperatures in the range of 7000 deg F.… more
Date: November 15, 1962
Creator: Field, J. H.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Description: Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1.… more
Date: March 15, 1962
Creator: Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Plating Thickness Tester

Description: An electromagnetic eddy current instrument is described that is capable of measuring copper and nickel plating 1 to 8 mils thick plated on bismuth mandrils of various sizes and shapes.
Date: November 15, 1957
Creator: Fitch, C. E., Jr.
Partner: UNT Libraries Government Documents Department
open access

Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak

Description: Review of previous work is presented in addition to the results of recent studies concerning loss of primary coolant when the system is cold and pressurized and the problem of supplying adequate cooling following the injection of light water.
Date: November 15, 1960
Creator: Wittenbrock, N. G. & Muraoka, J.
Partner: UNT Libraries Government Documents Department
open access

Quarterly Progress Report Research and Development Activities Fixation of Radioactive Residues: October - December, 1964

Description: Report presenting research and development activities in the field of radioactive wastes. This particular report is concerned with the fixation of radioactive residues when the failure of a pot liner destroyed the furnace.
Date: April 15, 1965
Creator: Platt, A. M.
Partner: UNT Libraries Government Documents Department