Search Results

Primary view of Metallurgy Research Operation: Quarterly Progress Report, January - March 1965
Cadwell, J. J.; Bierlein, T. K.; Bement, A. L.; Dillon, R. L. & Wheeler, R. G.
April 15, 1965
Primary view of A Sequence for Predicting Waste Transport by Ground Water
Nelson, R. William
April 15, 1965
Primary view of Preliminary investigation of water coagulation characteristics as affects reactor effluent radionuclides
Frymier, J. W.
April 15, 1965
Primary view of Battelle-Northwest Monthly Activities Report, March 1965
unknown creator
April 15, 1965
Primary view of Physics and Instruments Department Monthly Report, July 1965
Paul, R. S.
August 15, 1965
Primary view of Tungsten Cladding of Tungsten-Uranium Dioxide (W-UO2) Composites by Deposition from Tungsten Hexafluoride (WF6)
Lamartine, J.T. & Hoppe, A.W.
February 15, 1965
Primary view of SNAP 10A FSEM-3 Agena Compatibility Test
Teresa, M.
June 15, 1965
Primary view of Carbide Fuels in Fast Reactors
Wheelock, C. W.
September 15, 1965
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 5: July-December 1964
unknown creator
June 15, 1965
Primary view of Design, Construction, and Initial Operation of General Atomic In-Pile Loop
Simon, R. H.
February 15, 1965
Primary view of Privy roof mounted shield and shield support. Design progress report
Martin, L.P. (ed.)
June 15, 1965
Primary view of Reactor and Materials Technology Monthly Report, May 1965
Albaugh, F. W.
June 15, 1965
Primary view of Technical feasibility of using uranium oxide fuels at Hanford
unknown creator
February 15, 1965
Primary view of Reactor and materials technology monthly report, June 1965
Albaugh, F. W.
July 15, 1965
Primary view of Reactor and Materials Technology Department Monthly Report February 1965
Albaugh, F. W.
March 15, 1965
Primary view of Reactor and Materials Technology monthly report 02 Program, November 1965
Albaugh, F. W.
December 15, 1965
Primary view of Status of plant assistance irradiations as of May 14, 1965
Ferguson, J. H.
June 15, 1965
Primary view of Iron-masonite shield attenuation effectiveness status report
Gross, P. D.
April 15, 1965
Primary view of Beta-Backscatter Thickness Measurements of Deposited Niobium Carbide on Flat Graphite Surfaces
Steele, J.R.
June 15, 1965
Primary view of Fuel element hole location survey
Fatzer, E.G. & Sturtevant, J.
June 15, 1965
Primary view of Reactivity effects of the proposed SNPO-C countermeasure explosive projectile destruct system
Sipush, P. J. & Ravets, J. M.
May 15, 1965
Primary view of Battelle-Northwest monthly activities report, May 1965
unknown creator
June 15, 1965
Primary view of Vertical bowing measurements: B Reactor, tube 1575
DeMers, A. E.
September 15, 1965
Primary view of Shielding integrity check (SIC) tests for the E-MAD facility. Phase I. Final report
unknown creator
October 15, 1965
Back to Top of Screen