Search Results

Primary view of 0.351 micron Laser Beam propagation in High-temperature Plasmas
Froula, D.; Divol, L.; Meezan, N.; Ross, J.; Berger, R. L.; Michel, P. et al.
December 10, 2007
Primary view of 1-10 Mbar Laser-Driven Shocks Using the Janus Laser Facility
Dunn, J.; Price, D. F.; Moon, S. J.; Cauble, R. C.; Springer, P. T. & Ng, A.
August 10, 2001
Primary view of 2-MV electrostatic quadrupole injector for heavy-ion fusion
Bieniosek, F. M.; Celata, C. M.; Henestroza, E.; Kwan, J. W.; Prost, L. & Seidl, P. A.
November 10, 2004
Primary view of 3-D Force-balanced Magnetospheric Configurations
Zaharia, Sorin; Cheng, C. Z. & Maezawa, K.
February 10, 2003
Primary view of A 3-year plan for beam science in the heavy-ion fusion virtual national laboratory
Logan, B. Grant
September 10, 2001
Primary view of A 4.2 GS/sec. Synchronized Vertical Excitation System for SPS Studies - Steps Toward Wideband Feedback
Fox, John
July 10, 2012
Primary view of [4-Day Itinerary for Regional Institute Directors' Meeting]
unknown creator
1996-04-10/1996-04-14
Primary view of [5 Days Left To Enter TDNA Awards Contest]
Texas Daily Newspaper Association
January 10, 2008
Primary view of The 10,000 Year Plan
Srisaro, L.
February 10, 2006
Primary view of THE 10,000 YEAR PLAN
Srisuro, L.
February 10, 2006
Primary view of 10-MWe pilot-plant-receiver-panel test-requirements document: Solar Thermal Test Facility
unknown creator
June 10, 1978
Primary view of 14-Inch Swing Check Valve Test
Cygan, R.
February 10, 1960
Primary view of 14-MeV Neutron Generator Used as a Thermal Neutron Source
Dioszegi, I.
August 10, 2008
Primary view of 17 GHz High Gradient Accelerator Research
Temkin, Richard J. & Shapiro, Michael A.
July 10, 2013
Primary view of 25 Year Lifetime for Flexible Buildings Integrated Photovoltaics
Gross, Mark E.
July 10, 2010
Primary view of 40-kW field test power plant modification and development. Monthly technical status report No. 13, September 16, 1978-October 15, 1978
unknown creator
November 10, 1978
Primary view of 40 mm bore Nb-Ti model dipole magnet
Taylor, C.; Gilbert, W.; Hassenzahl, W.; Meuser, R.; Peters, C.; Rechen, J. et al.
September 10, 1984
Primary view of 95-1 Campaign evaporator boildown results
Miller, G. L.
October 10, 1994
Primary view of 100 Area soil washing: Bench scale tests on 116-F-4 pluto crib soil
Field, J. G.
June 10, 1994
Primary view of 100 Areas: (For Technical Progress Letter No. 96), April 30--May 6
Jordan, W. E.
May 10, 1946
Primary view of 100 Areas technical activities report: Engineering, May 1947
Woods, W. K.
June 10, 1947
Primary view of 100-K Area Downcomer Test Data Project CGI-883
Hutton, P. H.
January 10, 1961
Primary view of AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)
Thomas, W. K.
January 10, 2000
Primary view of 105-KW Sandfilter Backwash Pit sludge volume calculation
Dodd, E.N. Jr.
February 10, 1995
Back to Top of Screen