Search Results

Primary view of Tables of Einstein Functions: Vibrational Contributions to the Thermodynamic Functions
Hilsenrath, Joseph & Ziegler, Guy G.
July 12, 1962
Primary view of Fire Tests of Precast Cellular Concrete Floors and Roofs
Ryan, J. V. & Bender, E. W.
April 12, 1962
Primary view of Methods for the Dynamic Calibration of Pressure Transducers
Schweppe, J. L.; Eichberger, L. C.; Muster, D. F.; Michaels, E. L. & Paskusz, G. F.
December 12, 1963
Primary view of Microwave Impedance Measurements and Standards
Beatty, Robert W.
August 12, 1965
Primary view of Calibration of Liquid-in-Glass Thermometers
Swindells, James F.
February 12, 1965
Primary view of Molten-Salt Reactor Program Semiannual Progress Report: for Period Ending August 31, 1962
Oak Ridge National Laboratory
December 12, 1962
Primary view of Calculated Equilibrium Distributions for the Uranyl Nitrate - Tributyl Phosphate - Dilute Nitric Acid System for Temperatures Between 25 and 75 C
Wilburn, N. P.
August 12, 1960
Primary view of Preliminary Solution Critical Experiments for the High-Flux Isotope Reactor
Fox, J. K.; Magnuson, D. W. & Gilley, L. W.
June 12, 1963
Primary view of The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results
Zelezny, W. F.
July 12, 1963
Primary view of Stress Corrosion Cracking in Uranium-Molybdenum Alloys
Pridgeon, J. W.
August 12, 1963
Primary view of Comparative nuclear effects of biomedical interest. Civil effects study
White, C.S.; Bowen, I.G.; Richmond, D.R. & Corsbie, R.L.
January 12, 1961
Primary view of Douglas United Nuclear, Inc., sponsored research and development programs, FY-1967
Reid, R. W. & Stringer, J. T.
July 12, 1966
Primary view of Status of Special Reactor Process Tube Loadings
Walton, R. P.
July 12, 1966
Primary view of Design scope of the Z Plant Metal Control Facility, Project CGC-944
Haberman, H.D.
March 12, 1962
Primary view of Reactor thrust during boost in a high altitude trajectory
Moyer, J.H.
November 12, 1962
Primary view of Evaluation of Sanders Associates proposal of 6/12/63 and general comments
Kidder, R. E.
August 12, 1963
Primary view of A pluto-slam design to fit a maximum fineness ratio missile into a Polaris launch tube
Cornwell, R. S.
October 12, 1962
Primary view of Status of irradiations performed by testing for PNL as of December 10, 1965
Ferguson, J.H.
January 12, 1966
Primary view of Production test authorization 145 loading adjustment to increase spectrometer utilization
Guthrie, G.D.
June 12, 1968
Primary view of Richland isotope production matrix
Kushler, L. E. & Shimer, R. D.
May 12, 1966
Primary view of Nonuniform Aluminum Corrosion Program
Sheppard, D. O. & Larrick, A. P.
February 12, 1969
Primary view of FAST FLUX TEST FACILITY CONCEPTUAL FACILTY DESIGN DESCRIPTION FOR THE INERT GAS CELL EXAMINATION FACILITY NO. 71
unknown creator
December 12, 1968
Primary view of Seismic Waves from an Underground Explosion in a Salt Bed: Preliminary Report
Carder, Dean S.; Mickey, W. V.; Murphy, L. M.; Cloud, W. K.; Jordan, J. N. & Gordon, D. W.
April 12, 1962
Primary view of Protection Against Fallout Radiation in a Simple Structure
Breslin, A. J.; Loysen, P. & Weinstein, M. S.
August 12, 1963
Back to Top of Screen